Eco Solutions Group
Chelmsford-based solar PV, battery storage, heat pump and EV charging specialists established 2023
3+
Years in Business
50 km
Service Area
1-10
Employees
SurgePV Score
About Eco Solutions Group
Eco Solutions Group Ltd is a Chelmsford-based renewable energy and M&E contractor registered at Ground Floor, Swift House, 18 Hoffmans Way, Chelmsford, Essex CM1 1GU. The company was incorporated in January 2023 and is registered with Companies House under number 14603736.
The company specialises in solar PV systems, battery storage (Energy Storage Systems), air source heat pumps, EV chargers, MVHR ventilation, and electrical installations. As a full-service sustainable energy contractor, Eco Solutions Group can design, install, and maintain complete renewable energy upgrades for both residential and commercial properties in Chelmsford and surrounding Essex towns including Brentwood, Billericay, Colchester, and Southend-on-Sea.
Eco Solutions Group is verified on TrustATrader as a Renewable Energy Specialist operating in the Maldon South area of Essex, giving prospective customers an independent source for checking their work quality and customer feedback. The company’s central Chelmsford office makes them directly accessible to homeowners in the CM1 and CM2 postal areas. Further information and contact details are available through their website at theteam.eco.
Service Area
Eco Solutions Group serves the following areas within a 50 km radius:
Contact Information
Are you Eco Solutions Group?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Eco Solutions Group
What services does Eco Solutions Group offer?
Eco Solutions Group offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Eco Solutions Group MCS certified?
Yes, Eco Solutions Group is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Eco Solutions Group serve?
Eco Solutions Group serves Chelmsford, Brentwood, Billericay, Colchester, Southend-on-Sea, Maldon. They are based in Chelmsford with a service radius of 50 km.
What warranty does Eco Solutions Group offer?
Eco Solutions Group offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Eco Solutions Group's customer reviews?
Eco Solutions Group does not have any reviews yet. Be the first to leave a review after using their services.
How long has Eco Solutions Group been in business?
Eco Solutions Group was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.
Similar Installers in Chelmsford
Get a Free Solar Quote from Eco Solutions Group
Fill in your details and we'll connect you with Eco Solutions Group.
Quote request sent!
Eco Solutions Group will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile