LJM Solutions
MCS-accredited solar installer covering Derby and Derbyshire with TrustMark, RECC and NAPIT certification
3+
Years in Business
15
Customer Reviews
50 km
Service Area
1-10
Employees
SurgePV Score
About LJM Solutions
LJM Solutions is a family-run renewable energy company based in Long Eaton, Nottinghamshire, serving Derby, Derbyshire and the surrounding East Midlands region. The company was incorporated in 2023 and its installation engineers bring over 25 years of combined experience in solar PV, electrical contracting and energy-efficiency upgrades.
LJM Solutions holds MCS accreditation, TrustMark registration and RECC (Renewable Energy Consumer Code) backing, along with NAPIT-qualified electrical contractor status and an independent insurance-backed guarantee through the Quality Mark scheme. These accreditations cover residential and commercial solar PV, battery storage, EV charging and maintenance services.
The company’s approach prioritises honest advice over upselling. Customer reviews on Trustpilot highlight that LJM engineers have on occasion recommended a smaller system than the customer originally requested, reflecting a commitment to value rather than commission-driven sales. Reviews consistently praise the quality of installation, respectful conduct on site and clear post-installation guidance.
Contact LJM Solutions by phone on 07960 131125 or by email at [email protected]. They cover Derby, Nottingham, Long Eaton, Ilkeston, Heanor and Chesterfield, among other East Midlands towns.
Service Area
LJM Solutions serves the following areas within a 50 km radius:
Contact Information
Are you LJM Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
15 reviews
Verified Customer
I really can't recommend this company enough. We had our solar panels installed by them and they have been amazing from start to finish and beyond. Professional, friendly, competent, respectful and so helpful even with helping us get registered to export our excess energy.
Verified Customer
What a pleasant surprise to do business with a company that gives you honest information and advice. I was set to purchase two batteries with solar panels but was advised that I wouldn't need them — good honest advice rather than hard selling.
Verified Customer
This solar energy and electrical team are outstanding and highly professional. We were amazed at the amount of work they achieved in one day.
Frequently Asked Questions About LJM Solutions
What services does LJM Solutions offer?
LJM Solutions offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is LJM Solutions MCS certified?
Yes, LJM Solutions is MCS certified and also holds TrustMark, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does LJM Solutions serve?
LJM Solutions serves Derby, Nottingham, Long Eaton, Ilkeston, Heanor, Chesterfield, Sheffield. They are based in Derby with a service radius of 50 km.
What warranty does LJM Solutions offer?
LJM Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are LJM Solutions's customer reviews?
LJM Solutions has a 4.9/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has LJM Solutions been in business?
LJM Solutions was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.
Similar Installers in Derby
Get a Free Solar Quote from LJM Solutions
Fill in your details and we'll connect you with LJM Solutions.
Quote request sent!
LJM Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile