EE

EcoSphere Energy

Family-run MCS certified renewable energy installer in Devon and Somerset — formerly Reform Energy Services

Exeter, UK
5 (8 reviews)
Verified
Residential

4+

Years in Business

0

8

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

7.4 / 10
Customer Reviews
100%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About EcoSphere Energy

EcoSphere Energy is a family-run, MCS Certified renewable energy installer based in Tiverton, Devon, serving customers across Devon and Somerset including Exeter, Plymouth, Barnstaple, and Bournemouth. The company was incorporated in February 2022 as the successor business to Reform Energy Services, carrying forward over 15 years of combined industry experience.

EcoSphere Energy holds MCS registration AA-10060 and is fully accredited to assist customers in accessing the Government’s Boiler Upgrade Scheme (BUS). The company installs solar PV systems, heat pumps, and provides gas boiler services, making it a practical single-contractor choice for homeowners managing multiple aspects of a home energy transition.

The service area covers Devon and Somerset, with Exeter among the main urban markets. As a family-run operation, EcoSphere Energy emphasises a personal approach throughout — from initial survey and system design through to installation, commissioning, and post-installation certification documentation.

EcoSphere Energy is listed on the Renewable Energy Hub professional directory and is contactable via ecosphereenergy.co.uk.

Service Area

EcoSphere Energy serves the following areas within a 60 km radius:

ExeterTivertonPlymouthBarnstapleBournemouth

Contact Information

Are you EcoSphere Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About EcoSphere Energy

What services does EcoSphere Energy offer?

EcoSphere Energy offers Solar Installation, Battery Storage, Maintenance.

Is EcoSphere Energy MCS certified?

Yes, EcoSphere Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does EcoSphere Energy serve?

EcoSphere Energy serves Exeter, Tiverton, Plymouth, Barnstaple, Bournemouth. They are based in Exeter with a service radius of 60 km.

What warranty does EcoSphere Energy offer?

EcoSphere Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are EcoSphere Energy's customer reviews?

EcoSphere Energy has a 5/5 rating based on 8 customer reviews. Customers consistently rate them highly.

How long has EcoSphere Energy been in business?

EcoSphere Energy was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from EcoSphere Energy

Fill in your details and we'll connect you with EcoSphere Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote