SS

SunGift Solar

Leading solar installers in Devon since 2005 — MCS certified for five renewable technologies

Exeter, UK
4.6 (81 reviews)
Verified
Residential Commercial

21+

Years in Business

0

81

Customer Reviews

80 km

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
92%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About SunGift Solar

SunGift Solar is one of the UK’s most established solar installers, founded in 2005 by Gabriel Wondrausch and based at Unit 6 Huxham Barns, Huxham, Exeter, Devon EX5 4EJ. The company has been designing and installing solar PV systems for homes and businesses across Devon and the wider South West for over two decades.

SunGift Solar is one of the only companies in the UK to hold Microgeneration Certification Scheme (MCS) accreditation across five separate renewable technologies, covering solar PV, solar thermal, heat pumps, biomass, and energy storage. The company also holds NICEIC and TrustMark registrations and is a Tesla Powerwall and Tesla Powerpack Certified Installer.

Services span solar photovoltaics, whole-house integrated renewable energy systems, battery storage, EV charging, solar carports, ground-mount solar, and a comprehensive aftercare and maintenance programme. This breadth makes SunGift a practical single-contractor choice for homeowners and businesses looking to install multiple technologies at the same time.

On Google, SunGift Solar holds a 4.6-star average from 81 reviews. Customers consistently highlight the professionalism of both the survey and installation teams, and the company’s ability to communicate clearly at every stage. The wider Trustindex score is 4.7 from 103 verified customers.

SunGift Solar serves Exeter and surrounding Devon postcodes, as well as customers across Somerset and parts of Cornwall.

Service Area

SunGift Solar serves the following areas within a 80 km radius:

ExeterTauntonPlymouthTorquayBarnstaple

Are you SunGift Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS NICEIC TrustMark

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.6

81 reviews

Verified Customer

1 November 2024
Verified Customer

SunGift Solar completed the system exactly on time, to an excellent standard. Their team were all helpful, friendly and professional.

Verified Customer

15 September 2024
Verified Customer

Fantastic company with tons of experience and knowledge. They are our go-to experts for all things solar, energy storage and EV charging.

Verified Customer

20 July 2024
Verified Customer

Excellent at providing useful information and advice. The whole process from initial contact to completion was one of total competence.

Frequently Asked Questions About SunGift Solar

What services does SunGift Solar offer?

SunGift Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is SunGift Solar MCS certified?

Yes, SunGift Solar is MCS certified and also holds NICEIC, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does SunGift Solar serve?

SunGift Solar serves Exeter, Taunton, Plymouth, Torquay, Barnstaple. They are based in Exeter with a service radius of 80 km.

What warranty does SunGift Solar offer?

SunGift Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are SunGift Solar's customer reviews?

SunGift Solar has a 4.6/5 rating based on 81 customer reviews. Customers consistently rate them highly.

How long has SunGift Solar been in business?

SunGift Solar was founded in 2005 and has been in business for 21 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from SunGift Solar

Fill in your details and we'll connect you with SunGift Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote