Solar Installers in Exeter, UK

10 Companies 3,019 Reviews 2.3 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Exeter

Ranked by rating and customer reviews

DR
1

Devon Renewables

Verified
5.0 (58 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · RECC · OZEV

EE
2

EcoSphere Energy

Verified
5.0 (8 reviews)
Est. 2022 · Exeter · 25yr warranty
SolarBatteryMaintenance

MCS

ES
3

ESE Solar

Verified
4.7 (2800 reviews)
Exeter · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS

SS
4

SunGift Solar

Verified
4.6 (81 reviews)
Est. 2005 · Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · TrustMark

NS
5

Naked Solar Exeter

Verified
4.0 (34 reviews)
Est. 2010 · Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC · B Corp

SunPower + SolarEdge

3E
6

365 Energy Ltd

Verified
0.0 (38 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustATrader

AP
7

All Powered Up

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GG
8

Geo Green Power

Verified
0.0 (0 reviews)
Est. 2010 · Exeter · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS

SS
9

Solec SW Ltd

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarBatteryEV Charging

MCS

T
10

TargetCO2

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarEnergy Audit

MCS · TrustMark

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score. Companies are ranked by this score, with featured installers shown first.

Customer Reviews

We aggregate ratings from Google, Trustpilot, and Checkatrade. Only companies with 4.0+ ratings and verified reviews are listed.

Certifications

MCS certification is the UK standard. We also check for RECC, TrustMark, NAPIT, NICEIC, and ISO 9001 accreditations.

Track Record

Years in business, projects completed, warranty coverage, and service range contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking — placement is based on verified data only.

10

Verified Companies

3,019

Customer Reviews

Solar Installation in Exeter

Exeter offers strong potential for solar energy generation. UK solar irradiance levels, combined with falling panel costs and the Smart Export Guarantee, make solar a sound investment for homeowners and businesses across the city. A typical 4kW system generates between 3,400-4,200 kWh per year depending on roof orientation, pitch, and shading. South-facing roofs with a 30-35 degree pitch deliver the best performance.

When choosing a solar installer in Exeter, look for MCS certification as a baseline requirement. This ensures the installation meets industry standards and qualifies you for the Smart Export Guarantee. Check installer reviews, ask for references from local projects, and compare at least three quotes before committing. Many installers in Exeter also offer battery storage and EV charging solutions, allowing you to maximise your solar investment.

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the UK. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation in Exeter: Step by Step

1

Free Consultation

Contact an installer for a free site survey. They'll assess your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, expected generation, costs, and projected savings.

3

Installation

Scaffolding goes up, panels and inverter are installed. Most residential systems take 1-3 days.

4

Inspection

Building control sign-off, DNO notification, and MCS certificate issued for SEG eligibility.

5

Go Live

System is commissioned, monitoring is set up, and you start generating clean energy and saving money.

Frequently Asked Questions

How much do solar panels cost in Exeter?

Solar panel costs in Exeter are in line with UK averages. A 4kW residential system typically costs between £5,000 and £8,000 including installation. Prices may vary based on roof type, access, and the specific panels and inverter chosen. Get quotes from multiple MCS-certified installers in Exeter to compare.

Who is the best solar installer in Exeter?

The best solar installer in Exeter depends on your specific needs, budget, and project type. Check installer ratings, reviews, certifications (especially MCS), and years of experience on this page. We recommend getting quotes from at least three installers to compare pricing and service.

How long does a solar panel installation take?

A standard residential solar installation takes 1-3 days for the physical installation work. However, the full process from initial survey to commissioning typically takes 4-8 weeks, including site assessment, design, scaffolding, installation, electrical connection, and DNO notification.

Do I need planning permission for solar panels in the UK?

Most residential solar installations in the UK fall under permitted development and do not require planning permission, provided the panels do not protrude more than 200mm from the roof surface and are not installed on a listed building or in a conservation area. Commercial installations and ground-mounted systems may require planning approval.

Are You a Solar Installer in Exeter?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free