ESE Solar
UK solar installer serving Exeter with 4.7-star Trustpilot rating and 15-year maintenance packages
2026+
Years in Business
14,000+
Projects Completed
2,800
Customer Reviews
50 km
Service Area
51-200
Employees
SurgePV Score
About ESE Solar
ESE Solar operates an Exeter office at Unit 6, Harrier Court, Exeter, Devon EX5 2DR, serving homeowners and businesses across Devon as part of a nationwide network. The Exeter team has over twelve five-star Google reviews and has installed more than 1,076 solar panels, 84 inverters, and 100 solar batteries throughout the South West.
The company has served over 14,000 customers across the UK and holds a 4.7-star rating on Trustpilot from more than 2,800 verified reviews. Each installation is accompanied by 15 years of complimentary maintenance and an insurance-backed guarantee, which distinguishes ESE’s offering from smaller regional competitors.
ESE Solar takes a customised design approach rather than applying standardised panel layouts, reviewing each roof individually to maximise usable space and generation capacity. Services include solar PV installation, battery storage, and an ongoing monitoring and maintenance contract.
The Exeter office is open Monday to Thursday 09:00–17:30 and Friday 09:00–16:00. Installation teams are deployed across Devon, covering Exeter, Newton Abbot, Plymouth, Tiverton, and surrounding areas.
Service Area
ESE Solar serves the following areas within a 50 km radius:
Contact Information
Are you ESE Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.7
2800 reviews
Verified Customer
Engineers arrived on time and completed the work without problems. The work coordinator followed up to check on the service quality.
Verified Customer
The installation team was very polite, efficient, and tidy. Workers cleaned up after themselves. I would highly recommend ESE Solar.
Frequently Asked Questions About ESE Solar
What services does ESE Solar offer?
ESE Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is ESE Solar MCS certified?
Yes, ESE Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does ESE Solar serve?
ESE Solar serves Exeter, Newton Abbot, Plymouth, Tiverton, Honiton. They are based in Exeter with a service radius of 50 km.
What warranty does ESE Solar offer?
ESE Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are ESE Solar's customer reviews?
ESE Solar has a 4.7/5 rating based on 2800 customer reviews. Customers consistently rate them highly.
How long has ESE Solar been in business?
ESE Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Exeter
Get a Free Solar Quote from ESE Solar
Fill in your details and we'll connect you with ESE Solar.
Quote request sent!
ESE Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile