Freedom Solar Power
Texas-founded solar installer since 2007 with NABCEP-certified teams and a Houston office
19+
Years in Business
313
Customer Reviews
62 mi
Service Area
201-500
Employees
SurgePV Score
About Freedom Solar Power
Freedom Solar Power is a Texas-founded solar installation company established in 2007 by Adrian Buck. The Houston office is located at 1224 North Post Oak Rd, Suite 160B, Houston, TX 77055, with corporate headquarters in Austin. The company is one of the largest residential solar installers in Texas and holds BBB accreditation with an A rating since 2011.
Freedom Solar’s installation teams are NABCEP-certified and the company is a premier Tesla Powerwall certified installer. They install panels from Maxeon, Mission Solar, and Qcells, paired with Enphase inverters and battery storage from Tesla and Enphase. The company serves both residential and commercial customers across the Greater Houston area.
On Google, Freedom Solar Power holds a 4.8-star rating from over 300 reviews at their Houston location. Customers frequently cite the professional installation crews and quality equipment, though some reviews mention longer-than-expected permitting timelines.
Service Area
Freedom Solar Power serves the following areas within a 62-mile radius:
Contact Information
Are you Freedom Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
313 reviews
Verified Customer
Freedom Solar handled everything from design to installation. The NABCEP-certified crew was professional and completed the job on schedule. Very happy with the system output.
Verified Customer
Good installation experience and quality panels. The permitting process took a bit longer than expected but the team kept us informed throughout.
Verified Customer
Excellent service from start to finish. The Tesla Powerwall integration works flawlessly and we had zero issues during the recent power outage.
Frequently Asked Questions About Freedom Solar Power
What services does Freedom Solar Power offer?
Freedom Solar Power offers Solar Installation, Battery Storage.
Is Freedom Solar Power NABCEP certified?
Yes, Freedom Solar Power is NABCEP certified and also holds Tesla Powerwall Certified, BBB A Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Freedom Solar Power serve?
Freedom Solar Power serves Houston, Katy, Sugar Land, The Woodlands, Pearland, Galveston. They are based in Houston with a service radius of 100 km.
What warranty does Freedom Solar Power offer?
Freedom Solar Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Freedom Solar Power's customer reviews?
Freedom Solar Power has a 4.8/5 rating based on 313 customer reviews. Customers consistently rate them highly.
How long has Freedom Solar Power been in business?
Freedom Solar Power was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Houston
Get a Free Solar Quote from Freedom Solar Power
Fill in your details and we'll connect you with Freedom Solar Power.
Quote request sent!
Freedom Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile