GP

Gold Path Solar

Ohio's highest-rated solar company and EnergySage 2025/2026 Installer of the Year, based in Dublin near Columbus

Columbus, Ohio
4.9 (120 reviews)
Verified
Residential

4+

Years in Business

120

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
98%
Certifications
100%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Gold Path Solar

Gold Path Solar is the highest-rated solar company in Ohio and was named EnergySage’s Installer of the Year for both 2025 and 2026. Headquartered at 25 North St in Dublin, just outside Columbus, the company provides personalized residential solar installations across the Greater Columbus, Cincinnati, and Dayton markets. Founded in 2022, Gold Path Solar has quickly risen to the top of Ohio’s solar market through consistent quality and exceptional customer service.

The company holds an extensive list of industry certifications including NABCEP Installation Professional, NABCEP System Inspector, Enphase Certified Gold Installer, SolarEdge Preferred Partner, and manufacturer certifications from Silfab, REC, Q Cells, FranklinWH, and IronRidge. All Gold Path Solar installation crews have a minimum of five years of on-the-job experience, ensuring high-quality workmanship on every project.

Gold Path Solar maintains a 4.9-star rating across more than 120 customer reviews, with homeowners consistently highlighting the company’s professionalism, communication, and installation quality. The company uses American-made solar panels and works with premium equipment from Q Cells, Silfab, REC, Enphase, SolarEdge, and FranklinWH batteries.

Service Area

Gold Path Solar serves the following areas within a 93-mile radius:

ColumbusDublinWestervilleHilliardCincinnatiDaytonDelawareMarysville

Are you Gold Path Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring

Certifications & Accreditations

NABCEP Installation Professional NABCEP System Inspector Enphase Certified Gold Installer Enphase Certified Battery Installer SolarEdge Preferred Partner Silfab Registered Installer FranklinWH Certified Battery Installer REC Certified Professional Installer Q Cells Q.Partner

Partner Manufacturers

Panels

Q CellsSilfabREC

Inverters

EnphaseSolarEdge

Batteries

EnphaseFranklinWH

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

120 reviews

Ryan K.

12 August 2025
Verified Customer

Gold Path Solar lived up to the hype. The crew was professional, the installation was flawless, and our system has been outperforming projections. The NABCEP-certified team clearly knows what they are doing.

Jessica T.

3 May 2025
Verified Customer

From the initial consultation to the final inspection, Gold Path made the process seamless. They were transparent about costs, timeline, and expected production. Our Q Cells system has been excellent.

Brian H.

20 January 2025
Verified Customer

Chose Gold Path because of their EnergySage Installer of the Year award. They delivered. Professional, responsive, and the installation quality was top-notch. All crew members had 5+ years of experience.

Frequently Asked Questions About Gold Path Solar

What services does Gold Path Solar offer?

Gold Path Solar offers Solar Installation, Battery Storage, Solar Design, Monitoring.

Is Gold Path Solar NABCEP certified?

Gold Path Solar holds the following certifications: NABCEP Installation Professional, NABCEP System Inspector, Enphase Certified Gold Installer, Enphase Certified Battery Installer, SolarEdge Preferred Partner, Silfab Registered Installer, FranklinWH Certified Battery Installer, REC Certified Professional Installer, Q Cells Q.Partner. Contact them directly for the latest accreditation details.

What areas does Gold Path Solar serve?

Gold Path Solar serves Columbus, Dublin, Westerville, Hilliard, Cincinnati, Dayton, Delaware, Marysville. They are based in Columbus with a service radius of 150 km.

What warranty does Gold Path Solar offer?

Gold Path Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Gold Path Solar's customer reviews?

Gold Path Solar has a 4.9/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has Gold Path Solar been in business?

Gold Path Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Gold Path Solar

Fill in your details and we'll connect you with Gold Path Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote