GP

Gold Path Solar

EnergySage Installer of the Year serving Lexington with personalized residential solar solutions and employee-owned service

Lexington, Kentucky
4.8 (116 reviews)
Verified
Residential

4+

Years in Business

0

116

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.5 / 10
Customer Reviews
96%
Certifications
90%
Experience
70%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Gold Path Solar

Gold Path Solar is a 100% employee-owned solar installation company serving Lexington, KY and the surrounding region. Headquartered in Dublin, Ohio, Gold Path Solar has a dedicated Lexington service area and was named EnergySage Installer of the Year in both 2025 and 2026.

Gold Path Solar specializes in personalized residential solar solutions, utilizing industry expertise to customize home solar systems based on each homeowner’s energy needs and property characteristics. The company takes a holistic approach to solar, from pricing and financing options to product selection and installation.

Gold Path Solar holds a 4.8-star rating with 116 reviews and serves homeowners across Kentucky and Ohio. The company provides free consultations and operates Monday through Friday from 8:00 AM to 5:00 PM.

Service Area

Gold Path Solar serves the following areas within a 93-mile radius:

LexingtonLouisvilleGeorgetownNicholasvilleRichmondFrankfort

Are you Gold Path Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring

Certifications & Accreditations

EnergySage Installer of the Year 2025 EnergySage Installer of the Year 2026 BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

116 reviews

Verified Customer

8 September 2025
Verified Customer

Gold Path Solar made the entire process smooth from consultation to installation. Being employee-owned, you can tell the team genuinely cares about the quality of their work.

Verified Customer

15 June 2025
Verified Customer

Excellent experience with Gold Path Solar. They personalized our system design to our specific energy needs and the installation was completed ahead of schedule.

Verified Customer

2 April 2025
Verified Customer

Professional team and competitive pricing. The consultation was thorough and they explained all financing options clearly. The system has been performing well since install.

Frequently Asked Questions About Gold Path Solar

What services does Gold Path Solar offer?

Gold Path Solar offers Solar Installation, Battery Storage, Monitoring.

Is Gold Path Solar NABCEP certified?

Gold Path Solar holds the following certifications: EnergySage Installer of the Year 2025, EnergySage Installer of the Year 2026, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Gold Path Solar serve?

Gold Path Solar serves Lexington, Louisville, Georgetown, Nicholasville, Richmond, Frankfort. They are based in Lexington with a service radius of 150 km.

What warranty does Gold Path Solar offer?

Gold Path Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Gold Path Solar's customer reviews?

Gold Path Solar has a 4.8/5 rating based on 116 customer reviews. Customers consistently rate them highly.

How long has Gold Path Solar been in business?

Gold Path Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Gold Path Solar

Fill in your details and we'll connect you with Gold Path Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote