Green Rack Solar
NABCEP-certified solar installer with nearly 2,000 installations in the Columbus and Pittsburgh regions
7+
Years in Business
60
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Green Rack Solar
Green Rack Solar is a solar installation company founded in 2019 with offices in Columbus, Ohio and Pittsburgh, Pennsylvania. The Columbus office is located at 6365 Dublin Industrial Ln in Dublin, serving the Greater Columbus area. The company has completed nearly 2,000 solar installations across Ohio and Pennsylvania, establishing itself as one of the region’s fastest-growing solar contractors.
Green Rack Solar holds an extensive portfolio of industry certifications including NABCEP, Tesla Powerwall Certified Installer, Enphase Platinum Installer, Q Cells Q.Partner, REC ProTrust Installer, Span Certified, and Savant Certified. The company installs premium equipment from Q Cells and REC panels, Enphase microinverters, and Tesla Powerwall battery systems. Green Rack Solar handles residential and commercial projects of all sizes, including solar operations and maintenance services.
Green Rack Solar is BBB Accredited since 2023 and ranks among the top five solar installers in Columbus on EnergySage. Customer reviews consistently highlight the company’s transparency, professionalism, and quality of workmanship. The company offers standard 25-year product warranties and a 10-year workmanship guarantee on all installations.
Service Area
Green Rack Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Green Rack Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
60 reviews
Matt G.
Green Rack installed our 12 kW system in two days. Professional crew, clean installation, and great follow-up. They were upfront about costs and the system has been performing above projections since day one.
Karen W.
Truly a top-notch company doing solar the right way. They were honest and transparent about everything. The Enphase system they installed works perfectly and the monitoring app is great.
Phil S.
Good overall experience. The installation quality was excellent and the crew was respectful of our property. Minor scheduling delay due to weather but they kept us informed. Would recommend.
Frequently Asked Questions About Green Rack Solar
What services does Green Rack Solar offer?
Green Rack Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Monitoring, Commercial Solar.
Is Green Rack Solar NABCEP certified?
Yes, Green Rack Solar is NABCEP certified and also holds Tesla Powerwall Certified Installer, Enphase Platinum Installer, Q Cells Q.Partner, REC ProTrust Installer, Span Certified, Savant Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Green Rack Solar serve?
Green Rack Solar serves Columbus, Dublin, Westerville, Hilliard, Grove City, Reynoldsburg, Delaware, Pittsburgh. They are based in Columbus with a service radius of 150 km.
What warranty does Green Rack Solar offer?
Green Rack Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Rack Solar's customer reviews?
Green Rack Solar has a 4.8/5 rating based on 60 customer reviews. Customers consistently rate them highly.
How long has Green Rack Solar been in business?
Green Rack Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Columbus
Get a Free Solar Quote from Green Rack Solar
Fill in your details and we'll connect you with Green Rack Solar.
Quote request sent!
Green Rack Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile