HS

Hannah Solar

NABCEP-certified design/build solar firm headquartered in Atlanta, with 75+ megawatts of commercial and residential projects installed across the Southeast

Atlanta, Georgia
4.5 (20 reviews)
Verified
Commercial Residential

14+

Years in Business

0

20

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
90%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
100%

About Hannah Solar

Hannah Solar is a full-service, NABCEP-certified solar design and build firm headquartered at 3800 Camp Creek Parkway, Building 2400, Suite 110, in Atlanta, Georgia. The company has developed and built over 75 megawatts of solar projects for commercial, industrial, agricultural, and residential clients across the Southeast. Hannah Solar’s team includes NABCEP-certified solar photovoltaic installers, licensed master electricians in Georgia, Alabama, Mississippi, North Carolina, South Carolina, and Tennessee, as well as engineers, project management professionals, and service technicians.

The company provides turnkey solar installations, EV charging station installations, energy storage systems, and Generac critical backup generators. Hannah Solar handles every phase of the project, from engineering and design through permitting, construction, utility interconnection, and ongoing monitoring and service. The company’s engineering-first approach distinguishes it from many residential-focused installers, with detailed structural and electrical analyses for every project.

Hannah Solar serves the entire state of Georgia and neighboring Southeastern states from its Atlanta headquarters. The company’s commercial portfolio includes projects for businesses, schools, municipal buildings, and agricultural operations. Hannah Solar also serves residential customers seeking professionally engineered solar systems with battery backup capability.

Service Area

Hannah Solar serves the following areas within a 124-mile radius:

AtlantaDecaturMariettaKennesawSavannahAugustaAthens

Are you Hannah Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Energy Audit
Grid Connection
Maintenance
Monitoring

Certifications & Accreditations

NABCEP Licensed Master Electricians (GA, AL, MS, NC, SC, TN)

Partner Manufacturers

Batteries

Generac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

20 reviews

Marcus J.

18 September 2025
Verified Customer

Hannah Solar designed and installed a 50 kW commercial system for our warehouse. The engineering team was thorough and the installation crew was professional. System has been running at full capacity since day one.

Denise C.

28 May 2025
Verified Customer

We chose Hannah Solar for our residential installation because of their commercial-grade engineering approach. The system was sized accurately and the Generac backup gives us peace of mind during storms.

Travis W.

10 February 2025
Verified Customer

Working with Hannah Solar on our agricultural solar project was a great experience. They handled everything from design through interconnection with the utility. Knowledgeable team with real engineering depth.

Frequently Asked Questions About Hannah Solar

What services does Hannah Solar offer?

Hannah Solar offers Solar Installation, Battery Storage, EV Charging, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.

Is Hannah Solar NABCEP certified?

Yes, Hannah Solar is NABCEP certified and also holds Licensed Master Electricians (GA, AL, MS, NC, SC, TN) certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Hannah Solar serve?

Hannah Solar serves Atlanta, Decatur, Marietta, Kennesaw, Savannah, Augusta, Athens. They are based in Atlanta with a service radius of 200 km.

What warranty does Hannah Solar offer?

Hannah Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Hannah Solar's customer reviews?

Hannah Solar has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Hannah Solar been in business?

Hannah Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Hannah Solar

Fill in your details and we'll connect you with Hannah Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote