Hemphill Solar
Commercial and industrial solar specialist in Tulsa with DIY solar kits for residential customers
2026+
Years in Business
8
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Hemphill Solar
Hemphill Solar is a Tulsa-based solar energy provider located at 1305 N Louisville Ave, Tulsa, OK. The company is part of the Hemphill family of businesses and specializes in commercial and industrial solar power grid-tie systems designed to supplement power and lower energy bills for businesses.
Hemphill Solar designs and installs solar power systems on a commercial and industrial scale while also offering DIY solar power kits for residential consumers. Their commercial focus sets them apart from most local installers, making them a go-to option for Tulsa businesses looking to reduce energy costs through solar.
The company serves the greater Tulsa metropolitan area and beyond, providing custom-designed solar solutions tailored to each client’s energy needs and building specifications.
Service Area
Hemphill Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Hemphill Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
8 reviews
Verified Customer
Hemphill Solar designed and installed a grid-tie system on our commercial building. The team was professional and the system has been reducing our energy bills as projected.
Verified Customer
We chose Hemphill for our warehouse solar project. They handled the design and installation efficiently. Good value for commercial-scale work.
Verified Customer
Purchased a DIY solar kit from Hemphill and they provided excellent technical support throughout the process. Great option for hands-on homeowners.
Frequently Asked Questions About Hemphill Solar
What services does Hemphill Solar offer?
Hemphill Solar offers Solar Installation, system_design.
Is Hemphill Solar NABCEP certified?
Hemphill Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Hemphill Solar serve?
Hemphill Solar serves Tulsa, Broken Arrow, Oklahoma City, Bixby, Owasso. They are based in Tulsa with a service radius of 120 km.
What warranty does Hemphill Solar offer?
Hemphill Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Hemphill Solar's customer reviews?
Hemphill Solar has a 4.5/5 rating based on 8 customer reviews. Customers consistently rate them highly.
How long has Hemphill Solar been in business?
Hemphill Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tulsa
Get a Free Solar Quote from Hemphill Solar
Fill in your details and we'll connect you with Hemphill Solar.
Quote request sent!
Hemphill Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile