IS

Icon Solar

Kentucky's top-ranked residential solar installer with 16 years of experience serving Lexington homeowners and businesses

Lexington, Kentucky
4.5 (45 reviews)
Residential Commercial

17+

Years in Business

0

45

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

6.7 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About Icon Solar

Icon Solar is one of the largest residential solar installers in Ohio, Kentucky, and Indiana, serving the Lexington market since 2009. The company has over 16 years of experience in the greater tristate region and is ranked as the number-one installer in Kentucky.

Icon Solar provides residential and commercial solar panel installation, battery storage, and energy monitoring solutions. The company serves homeowners and businesses across Lexington and surrounding Central Kentucky communities including Georgetown, Nicholasville, Richmond, Frankfort, and Louisville.

Icon Solar operates Monday through Friday from 9:00 AM to 5:00 PM EST. The company has a dedicated Lexington solar service page and maintains a strong presence in the Kentucky market, offering free consultations and personalized system designs.

Service Area

Icon Solar serves the following areas within a 93-mile radius:

LexingtonLouisvilleGeorgetownNicholasvilleRichmondFrankfort

Are you Icon Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

45 reviews

Verified Customer

28 August 2025
Verified Customer

Icon Solar provided an excellent experience from start to finish. The team was professional, the installation was clean, and the system is performing above projections.

Verified Customer

10 June 2025
Verified Customer

Very satisfied with Icon Solar. They designed a system that fits our roof perfectly and the energy savings are significant. The crew was courteous and efficient.

Verified Customer

22 March 2025
Verified Customer

Good overall experience. The consultation was thorough and they explained the entire process clearly. Installation was completed on schedule with no issues.

Frequently Asked Questions About Icon Solar

What services does Icon Solar offer?

Icon Solar offers Solar Installation, Battery Storage, Monitoring.

Is Icon Solar NABCEP certified?

Icon Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Icon Solar serve?

Icon Solar serves Lexington, Louisville, Georgetown, Nicholasville, Richmond, Frankfort. They are based in Lexington with a service radius of 150 km.

What warranty does Icon Solar offer?

Icon Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Icon Solar's customer reviews?

Icon Solar has a 4.5/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has Icon Solar been in business?

Icon Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Icon Solar

Fill in your details and we'll connect you with Icon Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote