ION Solar
Full-service solar, geothermal, and wind energy installer with a physical Tulsa office
13+
Years in Business
50
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About ION Solar
ION Solar operates a physical office at 5454 S 99th E Ave, Tulsa, OK 74146. Founded in 2013, the company designs, installs, and services solar electric, solar hot water, solar pool heating, geothermal, and small wind turbine energy systems across Oklahoma and multiple other states.
ION Solar holds Oklahoma electrical license #192776 and provides residential and commercial solar installations throughout the Tulsa metro area. The company offers a full suite of renewable energy solutions, making it one of the more versatile energy contractors in the region.
With offices across multiple states, ION Solar brings national-scale resources to local Tulsa installations while maintaining a physical presence in the community for ongoing service and support.
Service Area
ION Solar serves the following areas within a 62-mile radius:
Contact Information
Are you ION Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
50 reviews
Verified Customer
ION Solar installed a system on our home in south Tulsa. The process from consultation to activation took about six weeks. The system is producing as promised and our electric bills have dropped significantly.
Verified Customer
Good experience with ION Solar. They handled permitting and interconnection with PSO. The installation crew was professional and finished in one day. Would recommend for Tulsa homeowners.
Verified Customer
Decent company with a wide range of renewable energy options beyond just solar. Communication could have been better during the permitting phase but the end result was solid.
Frequently Asked Questions About ION Solar
What services does ION Solar offer?
ION Solar offers Solar Installation, Battery Storage, Maintenance.
Is ION Solar NABCEP certified?
ION Solar holds the following certifications: Oklahoma License #192776. Contact them directly for the latest accreditation details.
What areas does ION Solar serve?
ION Solar serves Tulsa, Broken Arrow, Bixby, Owasso, Jenks, Sand Springs. They are based in Tulsa with a service radius of 100 km.
What warranty does ION Solar offer?
ION Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are ION Solar's customer reviews?
ION Solar has a 4.3/5 rating based on 50 customer reviews. They are well-regarded by their customers.
How long has ION Solar been in business?
ION Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tulsa
Get a Free Solar Quote from ION Solar
Fill in your details and we'll connect you with ION Solar.
Quote request sent!
ION Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile