KS

Kardan Solar

BBB-accredited solar installer with over a decade of experience serving Lexington residential and commercial clients

Lexington, Kentucky
4.7 (20 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

20

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

7.8 / 10
Customer Reviews
94%
Certifications
60%
Experience
100%
Services Range
60%
Warranty Coverage
80%
Online Presence
50%

About Kardan Solar

Kardan Solar is a locally owned and BBB-accredited solar installation company serving Lexington, KY and the surrounding region. With over a decade of experience in the solar industry, the company provides residential and commercial solar panel installations and battery storage solutions.

Kardan Solar offers meticulous solar panel installation services, ensuring high efficiency and significant cost savings for homeowners and businesses. The company provides free estimates and handles the entire process from consultation through installation and post-install support.

Kardan Solar serves the greater Lexington-Fayette area including Georgetown, Nicholasville, Richmond, Frankfort, and Versailles. The company has a dedicated Lexington service page and maintains a strong presence in the Central Kentucky solar market.

Service Area

Kardan Solar serves the following areas within a 75-mile radius:

LexingtonGeorgetownNicholasvilleRichmondFrankfortVersailles

Are you Kardan Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

20 reviews

Verified Customer

20 August 2025
Verified Customer

Kardan Solar was very friendly and professional. The job was top-notch and was completed very quickly. They delivered exactly what was promised.

Verified Customer

30 May 2025
Verified Customer

Very professional, quality work, done on time, and for a good price. The team was courteous and cleaned up after the installation. Highly recommend.

Verified Customer

12 March 2025
Verified Customer

Good experience overall with Kardan Solar. They provided a clear explanation of the system design and financing options. The installation was completed as scheduled.

Frequently Asked Questions About Kardan Solar

What services does Kardan Solar offer?

Kardan Solar offers Solar Installation, Battery Storage.

Is Kardan Solar NABCEP certified?

Kardan Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Kardan Solar serve?

Kardan Solar serves Lexington, Georgetown, Nicholasville, Richmond, Frankfort, Versailles. They are based in Lexington with a service radius of 120 km.

What warranty does Kardan Solar offer?

Kardan Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Kardan Solar's customer reviews?

Kardan Solar has a 4.7/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Kardan Solar been in business?

Kardan Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Kardan Solar

Fill in your details and we'll connect you with Kardan Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote