Lucent Energy
Direct solar installer in Savannah providing residential and commercial solar panels, battery storage, and Tesla Solar Roof with in-house crews
2026+
Years in Business
1,000+
Projects Completed
30
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Lucent Energy
Lucent Energy Management is a direct solar installer based at 608 Lee Boulevard in Savannah, Georgia. The company provides residential and commercial solar energy solutions across the Savannah, South Carolina, and New Jersey markets, with over 1,000 satisfied customers. Lucent Energy handles all installation work in-house and never uses subcontractors, ensuring consistent quality across every project.
The company offers solar panel installation with warranties up to 30 years, Tesla Solar Roof tiles with 25-year warranties, battery energy storage systems, EV charging stations, and solar-powered LED lighting for commercial customers. Lucent Energy also provides microgrid battery systems for commercial applications. Every installation comes with a 10-year workmanship and craftsmanship warranty.
Lucent Energy serves the greater Savannah area including Pooler, Richmond Hill, Hinesville, Tybee Island, Statesboro, and surrounding communities. The company operates Monday through Friday from 9 AM to 5 PM.
Service Area
Lucent Energy serves the following areas within a 75-mile radius:
Contact Information
Are you Lucent Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Panels
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
30 reviews
Brian P.
Lucent Energy installed our solar system using their own in-house crews, which gave us confidence in the quality. The team was efficient, effective, and polite throughout the entire process.
Catherine M.
We chose Lucent because they handle everything in-house and never use subcontractors. The installation was professional and our system is producing great results.
Robert A.
Good company with knowledgeable staff. They installed our Tesla Solar Roof and battery system. The project took a few weeks but the result was worth the wait.
Frequently Asked Questions About Lucent Energy
What services does Lucent Energy offer?
Lucent Energy offers Solar Installation, Solar Design, Battery Storage, EV Charging, Maintenance, Monitoring.
Is Lucent Energy NABCEP certified?
Lucent Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Lucent Energy serve?
Lucent Energy serves Savannah, Pooler, Richmond Hill, Hinesville, Tybee Island, Statesboro. They are based in Savannah with a service radius of 120 km.
What warranty does Lucent Energy offer?
Lucent Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Lucent Energy's customer reviews?
Lucent Energy has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Lucent Energy been in business?
Lucent Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Savannah
Get a Free Solar Quote from Lucent Energy
Fill in your details and we'll connect you with Lucent Energy.
Quote request sent!
Lucent Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile