MS

Mann Solar

NABCEP-certified Lexington solar installer with over 15 years of experience and 2,250+ installations across Kentucky

Lexington, Kentucky
4.8 (30 reviews)
Verified
Residential Commercial off-grid

15+

Years in Business

2,250+

Projects Completed

30

Customer Reviews

93 mi

Service Area

1-10

Employees

SurgePV Score

9 / 10
Customer Reviews
96%
Certifications
100%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Mann Solar

Mann Solar is a NABCEP-certified solar installation company located at 707 Downs Ave, Suite 130, Lexington, KY 40505. Founded by Nathan Mann, the company has over 15 years of experience and more than 2,250 completed installations across Kentucky and nationwide.

Mann Solar offers a full range of services including solar system installation, solar products and accessories, DIY solar kits, custom solar solutions, and solar consulting and support. The company is certified by NABCEP, Generac, Sol-Ark, and Lux Power, and holds an A+ rating with the Better Business Bureau since February 2022.

Mann Solar provides clean, affordable solar power for homes and businesses, designing and installing high-efficiency solar arrays and battery systems. The company is known for competitive pricing, with customers reporting costs significantly below other local installers. Mann Solar serves all of Kentucky with a focus on the Central Kentucky region.

Service Area

Mann Solar serves the following areas within a 93-mile radius:

LexingtonLancasterRichmondGeorgetownNicholasvilleFrankfort

Are you Mann Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

NABCEP Certified BBB A+ Generac Certified Sol-Ark Certified

Partner Manufacturers

Inverters

Sol-ArkLux Power

Batteries

Generac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

30 reviews

Verified Customer

15 August 2025
Verified Customer

Mann Solar put a 9-panel install on our roof for 60% of the cost quoted by another local installer. Nathan was knowledgeable and the crew did excellent work.

Verified Customer

2 June 2025
Verified Customer

Outstanding service from consultation to installation. Nathan Mann personally oversaw our project and the system is performing above expectations. Highly recommend.

Verified Customer

28 March 2025
Verified Customer

Affordable pricing, exceptional customer service, and knowledgeable staff. Mann Solar made going solar easy and straightforward. The installation was completed quickly.

Frequently Asked Questions About Mann Solar

What services does Mann Solar offer?

Mann Solar offers Solar Installation, Battery Storage, Maintenance.

Is Mann Solar NABCEP certified?

Mann Solar holds the following certifications: NABCEP Certified, BBB A+, Generac Certified, Sol-Ark Certified. Contact them directly for the latest accreditation details.

What areas does Mann Solar serve?

Mann Solar serves Lexington, Lancaster, Richmond, Georgetown, Nicholasville, Frankfort. They are based in Lexington with a service radius of 150 km.

What warranty does Mann Solar offer?

Mann Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Mann Solar's customer reviews?

Mann Solar has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Mann Solar been in business?

Mann Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Mann Solar

Fill in your details and we'll connect you with Mann Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote