MS

Merica Solar Panels

Savannah solar installer offering residential and commercial solar panels with a 25-year production guarantee

Savannah, Georgia
4.5 (10 reviews)
Residential Commercial

2026+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

6.9 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Merica Solar Panels

Merica Solar Panels is a solar installation company based at 33 Bull Street, Suite 44 in Savannah, Georgia. The company serves both residential and commercial customers, providing solar panel installation using high-quality components installed by experienced professionals. Merica Solar Panels distinguishes itself with a 25-year production guarantee, claiming to be the only solar installer in the area that guarantees the energy output of every system. If a system produces less power than projected, the company covers the difference.

Each solar installation is inspected by a Merica Solar Panels professional after completion, followed by a local or city inspector review before the utility company assesses and grants permission to activate the system. The company works with utility providers to ensure customers receive all eligible billing credits.

Merica Solar Panels serves the Savannah metropolitan area including Pooler, Richmond Hill, Tybee Island, and Garden City.

Service Area

Merica Solar Panels serves the following areas within a 50-mile radius:

SavannahPoolerRichmond HillTybee IslandGarden City

Are you Merica Solar Panels?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
Monitoring

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

10 reviews

Janet P.

18 September 2025
Verified Customer

Merica Solar installed our system and the process was smooth from start to finish. What sold us was their 25-year production guarantee. If the system underperforms, they cover the difference.

William T.

25 June 2025
Verified Customer

Good experience with this company. They used high quality components and the installation was inspected by both their team and the local inspector before being activated.

Laura B.

12 March 2025
Verified Customer

Professional installation and good communication. The team explained everything clearly and our system has been producing energy as promised.

Frequently Asked Questions About Merica Solar Panels

What services does Merica Solar Panels offer?

Merica Solar Panels offers Solar Installation, Solar Design, Maintenance, Monitoring.

Is Merica Solar Panels NABCEP certified?

Merica Solar Panels holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Merica Solar Panels serve?

Merica Solar Panels serves Savannah, Pooler, Richmond Hill, Tybee Island, Garden City. They are based in Savannah with a service radius of 80 km.

What warranty does Merica Solar Panels offer?

Merica Solar Panels offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Merica Solar Panels's customer reviews?

Merica Solar Panels has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Merica Solar Panels been in business?

Merica Solar Panels was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Merica Solar Panels

Fill in your details and we'll connect you with Merica Solar Panels.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote