MH Electrical & Solar Installations
MCS, NAPIT, RECC and OZEV-approved solar and battery storage installer covering Derby and all of Derbyshire
2026+
Years in Business
80 km
Service Area
1-10
Employees
SurgePV Score
About MH Electrical & Solar Installations
M H Electrical & Solar Installations Ltd is an Ashbourne-based electrical and renewable energy company serving Derby and the wider Derbyshire area. The company is registered at 13 Park Avenue, Ashbourne, Derbyshire, DE6 1GA and operates within a 50-mile service radius, covering most of Derbyshire, Staffordshire, Nottinghamshire and Cheshire.
The company holds MCS (Microgeneration Certification Scheme) accreditation for solar PV and battery storage, NAPIT registration for electrical work, RECC (Renewable Energy Consumer Code) membership and OZEV approval for EV charge point installations. This makes MH Electrical one of the more comprehensively certified residential and commercial renewable energy contractors in the Derbyshire region.
Services include domestic and commercial solar panel installation, battery storage systems and EV charging point installation. The company provides full-turnkey delivery from initial survey and system design through to installation and commissioning.
MH Electrical & Solar Installations can be contacted via the enquiry form at mhelectrical.co.uk or through their Facebook page at facebook.com/mhelectrical.co.uk.
Service Area
MH Electrical & Solar Installations serves the following areas within a 80 km radius:
Contact Information
Are you MH Electrical & Solar Installations?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About MH Electrical & Solar Installations
What services does MH Electrical & Solar Installations offer?
MH Electrical & Solar Installations offers Solar Installation, Battery Storage, EV Charging.
Is MH Electrical & Solar Installations MCS certified?
Yes, MH Electrical & Solar Installations is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does MH Electrical & Solar Installations serve?
MH Electrical & Solar Installations serves Derby, Ashbourne, Belper, Matlock, Bakewell, Buxton, Chesterfield, Uttoxeter. They are based in Derby with a service radius of 80 km.
What warranty does MH Electrical & Solar Installations offer?
MH Electrical & Solar Installations offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are MH Electrical & Solar Installations's customer reviews?
MH Electrical & Solar Installations does not have any reviews yet. Be the first to leave a review after using their services.
How long has MH Electrical & Solar Installations been in business?
MH Electrical & Solar Installations was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Derby
Get a Free Solar Quote from MH Electrical & Solar Installations
Fill in your details and we'll connect you with MH Electrical & Solar Installations.
Quote request sent!
MH Electrical & Solar Installations will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile