OP

Ohio Power Solutions

NABCEP-certified solar installer with 13+ years of experience serving the Greater Columbus area

Columbus, Ohio
4.9 (35 reviews)
Verified
Residential Commercial

17+

Years in Business

35

Customer Reviews

75 mi

Service Area

2-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
98%
Certifications
60%
Experience
100%
Services Range
100%
Warranty Coverage
87%
Online Presence
50%

About Ohio Power Solutions

Ohio Power Solutions is a solar installation company founded in 2009, serving the Greater Columbus area from its base in London, Ohio. Both company owners are NABCEP Solar PV certified since 2011, bringing over a decade of hands-on experience to every project. The company designs, engineers, installs, and maintains professional-quality solar panel systems, wind turbine systems, and energy efficiency products for homes and businesses.

Ohio Power Solutions handles residential and commercial projects of all sizes, from small rooftop systems to large-scale commercial installations. The company has completed projects ranging from 30-panel residential arrays to 170-panel commercial rooftop systems. OPS manages the entire process including system design, engineering, permitting, installation, and utility interconnection.

Ohio Power Solutions maintains an outstanding 4.9-star average rating across review platforms, with customers consistently praising the company’s competitive pricing, professional workmanship, and NABCEP-certified expertise. The company offers a standout 15-year workmanship warranty, well above the industry standard, plus 25-year product warranties on panels and inverters.

Service Area

Ohio Power Solutions serves the following areas within a 75-mile radius:

ColumbusDublinWestervilleHilliardLondonSpringfieldMarysvilleDelaware

Are you Ohio Power Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance
Monitoring
Commercial Solar

Certifications & Accreditations

NABCEP

Partner Manufacturers

Inverters

SMA

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

15 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

35 reviews

Jeff M.

2 July 2025
Verified Customer

Ohio Power Solutions was by far the most competitive quote we received and the hardware quality was excellent. Both owners are NABCEP certified which gave us confidence. The 40-panel system was installed cleanly and on time.

Sandra B.

15 April 2025
Verified Customer

Quick installation and very professional team. They handled all the permitting and utility paperwork. Our system has been running perfectly and the monitoring shows we are producing more than projected.

Mark E.

28 November 2024
Verified Customer

Great experience from start to finish. Competitive pricing, quality equipment, and professional installation. The 15-year workmanship warranty sealed the deal for us. Highly recommend OPS.

Frequently Asked Questions About Ohio Power Solutions

What services does Ohio Power Solutions offer?

Ohio Power Solutions offers Solar Installation, Battery Storage, Solar Design, Maintenance, Monitoring, Commercial Solar.

Is Ohio Power Solutions NABCEP certified?

Yes, Ohio Power Solutions is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Ohio Power Solutions serve?

Ohio Power Solutions serves Columbus, Dublin, Westerville, Hilliard, London, Springfield, Marysville, Delaware. They are based in Columbus with a service radius of 120 km.

What warranty does Ohio Power Solutions offer?

Ohio Power Solutions offers 25-year panel warranty, 25-year inverter warranty, and 15-year installation/workmanship warranty.

How are Ohio Power Solutions's customer reviews?

Ohio Power Solutions has a 4.9/5 rating based on 35 customer reviews. Customers consistently rate them highly.

How long has Ohio Power Solutions been in business?

Ohio Power Solutions was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Ohio Power Solutions

Fill in your details and we'll connect you with Ohio Power Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote