Poulin Solar Pro
Authorized Enphase and QCell installer offering 25/25/25 warranty coverage in Albuquerque and Santa Fe
11+
Years in Business
65
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Poulin Solar Pro
Poulin Solar Pro is the solar division of Poulin Design Center, a family-owned business established in 1982 by Tom Poulin in Albuquerque. The solar arm launched in 2015 and operates from 8600 Pan American Fwy NE, serving homeowners and businesses across the Albuquerque metro area and Santa Fe. Poulin Solar Pro is an authorized installer for Enphase Energy products and partners with top-tier panel manufacturers including QCell and Hyundai.
The company distinguishes itself with one of the strongest warranty packages in the New Mexico market: a 25/25/25 warranty covering product performance, equipment, and labor for a full 25 years. Poulin Solar Pro uses Enphase microinverters and IQ Battery storage systems across their installations, giving homeowners panel-level monitoring and optimization. Their team handles the full project lifecycle from energy audit and system design through installation, permitting, and long-term monitoring.
Poulin Solar Pro holds a BBB A+ accreditation and averages 4.7 stars from 65 customer reviews. The company has earned recognition on Houzz with a 4.9-star rating and is consistently listed among the top solar installers in Albuquerque. Customers highlight the company’s clear communication, competitive pricing, and the reliability of their Enphase-based systems. Their connection to the broader Poulin Design Center also gives them access to remodeling expertise for roof and structural upgrades when needed.
Service Area
Poulin Solar Pro serves the following areas within a 75-mile radius:
Contact Information
Are you Poulin Solar Pro?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
65 reviews
Greg N.
Poulin Solar Pro installed a 9 kW system with QCell panels and Enphase microinverters on our Albuquerque home. The 25-year triple warranty sealed the deal for us. System has been performing above estimates.
Diane F.
Professional from start to finish. The design team showed us exactly how our system would look before installation began. Completed in three days with zero issues. Our electricity costs dropped by 85%.
Michael B.
Good company with quality equipment. The Enphase monitoring system is easy to use and shows real-time production. Installation was smooth, though it took about six weeks from contract to completion due to permitting.
Frequently Asked Questions About Poulin Solar Pro
What services does Poulin Solar Pro offer?
Poulin Solar Pro offers Solar Installation, Battery Storage, Maintenance, Monitoring, Energy Audit.
Is Poulin Solar Pro NABCEP certified?
Poulin Solar Pro holds the following certifications: BBB A+ Accredited, Authorized Enphase Installer. Contact them directly for the latest accreditation details.
What areas does Poulin Solar Pro serve?
Poulin Solar Pro serves Albuquerque, Santa Fe, Rio Rancho, Los Lunas, Bernalillo, Corrales, Edgewood. They are based in Albuquerque with a service radius of 120 km.
What warranty does Poulin Solar Pro offer?
Poulin Solar Pro offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Poulin Solar Pro's customer reviews?
Poulin Solar Pro has a 4.7/5 rating based on 65 customer reviews. Customers consistently rate them highly.
How long has Poulin Solar Pro been in business?
Poulin Solar Pro was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Albuquerque
Get a Free Solar Quote from Poulin Solar Pro
Fill in your details and we'll connect you with Poulin Solar Pro.
Quote request sent!
Poulin Solar Pro will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile