PPC Solar
New Mexico's premier renewable energy installer since 1979 with NABCEP-certified technicians
47+
Years in Business
20
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About PPC Solar
PPC Solar, operating as Paradise Power Company, is one of New Mexico’s longest-running solar installation firms, founded in 1979 in Taos. The company maintains offices in both Taos and Albuquerque at 4415 Hawkins St. NE Suite D, serving residential, commercial, and utility-scale customers across New Mexico and southern Colorado. With over four decades in the renewable energy industry, PPC Solar brings deep expertise in photovoltaic system development, design, and installation.
The company specializes in battery-based PV systems and off-grid installations, a niche that sets it apart from many competitors. PPC Solar’s team includes NABCEP-certified technicians and sales consultants who handle every project phase, from energy audits and system design through permitting, installation, and ongoing maintenance. The company also installs electric vehicle charging stations and provides system upgrades for existing solar customers.
PPC Solar holds a strong reputation across review platforms, with customers praising the company’s technical knowledge and reliability on complex installations. Their particular strength in off-grid and battery-backup systems makes them a go-to choice for rural New Mexico properties where grid access is limited or unreliable. The company offers 25-year manufacturer warranties on panels and inverters with a 10-year workmanship guarantee.
Service Area
PPC Solar serves the following areas within a 124-mile radius:
Contact Information
Are you PPC Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
20 reviews
Richard B.
PPC Solar designed and installed a complete off-grid system for our remote property near Taos. Their 45 years of experience in battery-based systems really showed. Everything works perfectly, even through winter.
Catherine D.
We chose PPC for their deep expertise in New Mexico solar. The NABCEP-certified team designed an optimal system for our Albuquerque home. Installation was clean and fast, and the system has exceeded projections.
Mark S.
Very knowledgeable team with decades of experience. They installed our EV charger alongside solar panels seamlessly. The only reason for four stars is the wait time for the initial consultation, but the quality was worth it.
Frequently Asked Questions About PPC Solar
What services does PPC Solar offer?
PPC Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Energy Audit, off_grid_solar.
Is PPC Solar NABCEP certified?
Yes, PPC Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does PPC Solar serve?
PPC Solar serves Albuquerque, Taos, Santa Fe, Rio Rancho, Las Vegas, Espanola. They are based in Albuquerque with a service radius of 200 km.
What warranty does PPC Solar offer?
PPC Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are PPC Solar's customer reviews?
PPC Solar has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has PPC Solar been in business?
PPC Solar was founded in 1979 and has been in business for 47 years. They are one of the more experienced solar installers in their area.
Similar Installers in Albuquerque
Get a Free Solar Quote from PPC Solar
Fill in your details and we'll connect you with PPC Solar.
Quote request sent!
PPC Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile