Samso Energy
Fast-growing renewables company providing solar PV and heat pump solutions across Coventry and the UK, inspired by Denmark's Samso Island
4+
Years in Business
27
Customer Reviews
250 km
Service Area
11-50
Employees
SurgePV Score
About Samso Energy
Samso Energy is a renewable energy company based at Kopshop, 6 Old London Road, Kingston upon Thames, KT2 6QF. Named after Samso Island in Denmark, the world’s first renewable energy island, the company provides solar PV and air source heat pump installations for both residential and commercial customers. Samso Energy serves Coventry as part of their nationwide installation coverage and holds MCS accreditation and Solar Energy UK membership.
The company offers residential and commercial solar PV systems, battery storage, and EV wall-charger installations. Samso Energy provides a free instant quote tool on their website and conducts detailed home surveys before designing bespoke systems. Their installation teams operate across the UK, covering Coventry and the wider West Midlands alongside their southern England heartland. The company places emphasis on making the transition to renewable energy straightforward, handling all paperwork including MCS documentation.
On Trustpilot, Samso Energy has received 27 reviews with customers praising the professionalism of installation crews, the transparency of the process, and the quality of post-installation support. Google reviews also highlight the speed of installation and the politeness of on-site teams. The company offers a 25-year panel warranty and ongoing support after commissioning.
Service Area
Samso Energy serves the following areas within a 250 km radius:
Contact Information
Are you Samso Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
5 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.2
27 reviews
Verified Customer
Right from the initial contact through to the support after the installation the Samso team has been thorough, conscientious and professional.
Verified Customer
A seamless and transparent process from start to finish. Michael and Harrison who installed the panels and Callum the electrician who connected everything up were the best contractors we have seen on site for a very long time.
Verified Customer
The team did a fabulous job installing my Solar and Heat pump. They were on time, helpful, cleaned up daily until installation completed and informed me of all progress as they went along.
Frequently Asked Questions About Samso Energy
What services does Samso Energy offer?
Samso Energy offers Solar Installation, Battery Storage, EV Charging, Energy Audit.
Is Samso Energy MCS certified?
Yes, Samso Energy is MCS certified and also holds Solar Energy UK certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Samso Energy serve?
Samso Energy serves Coventry, Birmingham, London, Southampton, Winchester, Leicester. They are based in Coventry with a service radius of 250 km.
What warranty does Samso Energy offer?
Samso Energy offers 25-year panel warranty, and 5-year installation/workmanship warranty.
How are Samso Energy's customer reviews?
Samso Energy has a 4.2/5 rating based on 27 customer reviews. They are well-regarded by their customers.
How long has Samso Energy been in business?
Samso Energy was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Coventry
Get a Free Solar Quote from Samso Energy
Fill in your details and we'll connect you with Samso Energy.
Quote request sent!
Samso Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile