SS

Savannah Solar Power

Local Savannah solar installation company providing residential and commercial solar panel systems throughout the greater Savannah area

Savannah, Georgia
4.5 (10 reviews)
Residential Commercial

2026+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

7.2 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Savannah Solar Power

Savannah Solar Power LLC is a local solar installation company based at 2 East Bryan Street in Savannah, Georgia. The company provides solar panel installation services for residential and commercial customers throughout the greater Savannah area. Savannah Solar Power handles the full project lifecycle from initial consultation and site assessment through system design, permitting, installation, and ongoing maintenance.

The company works with local utility providers to ensure homeowners receive all eligible billing credits and interconnection approvals. Savannah Solar Power designs systems tailored to each property’s energy needs and roof characteristics, taking into account Savannah’s climate and solar irradiance levels to optimize system performance.

Savannah Solar Power serves the greater Savannah metropolitan area including Pooler, Richmond Hill, Hinesville, Tybee Island, and Garden City.

Service Area

Savannah Solar Power serves the following areas within a 50-mile radius:

SavannahPoolerRichmond HillHinesvilleTybee IslandGarden City

Are you Savannah Solar Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Battery Storage
Maintenance
financing_assistance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

10 reviews

Tyler S.

14 September 2025
Verified Customer

Savannah Solar Power installed a system on our home and handled everything from start to finish. The team was professional and knowledgeable about local permitting requirements.

Rachel M.

20 June 2025
Verified Customer

Good local company that made the solar process straightforward. They were transparent about costs and helped us understand what to expect for energy production in the Savannah climate.

Kevin D.

8 March 2025
Verified Customer

Solid installation and good communication throughout. The crew was efficient and cleaned up after themselves. Our panels have been performing well since activation.

Frequently Asked Questions About Savannah Solar Power

What services does Savannah Solar Power offer?

Savannah Solar Power offers Solar Installation, Solar Design, Battery Storage, Maintenance, financing_assistance.

Is Savannah Solar Power NABCEP certified?

Savannah Solar Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Savannah Solar Power serve?

Savannah Solar Power serves Savannah, Pooler, Richmond Hill, Hinesville, Tybee Island, Garden City. They are based in Savannah with a service radius of 80 km.

What warranty does Savannah Solar Power offer?

Savannah Solar Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Savannah Solar Power's customer reviews?

Savannah Solar Power has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Savannah Solar Power been in business?

Savannah Solar Power was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Savannah Solar Power

Fill in your details and we'll connect you with Savannah Solar Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote