SL

Sol Luna Solar

NABCEP-certified New Mexico solar installer with 30+ years of construction experience serving Albuquerque, Santa Fe, and Taos

Albuquerque, New Mexico
4.6 (40 reviews)
Verified
Residential Commercial

35+

Years in Business

0

40

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

8.5 / 10
Customer Reviews
92%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Sol Luna Solar

Sol Luna Solar is a New Mexico-based solar installation company with roots dating back to 1991, when the founding team began working in construction across the state. The company formally launched its solar division in 2012 and operates from 201 Sin Nombre Ct NE in Albuquerque. Sol Luna serves a wide geographic area including Albuquerque, Santa Fe, Taos, Rio Rancho, and communities throughout northern and central New Mexico.

The company is a NABCEP-certified installer and holds an A+ rating from the BBB. Sol Luna Solar offers turn-key solar installation packages for both residential and commercial customers, handling every step from initial consultation and system design through permitting, installation, inspection, and system activation. Their construction background gives them particular strength in roof assessments and structural considerations during the installation process.

Sol Luna Solar maintains a 4.6-star average rating across review platforms, with customers highlighting their straightforward pricing, reliable timelines, and attentive customer service. The company backs all installations with a 10-year workmanship warranty alongside 25-year manufacturer warranties on panels and inverters. Their broad service area and decades of local construction experience make them a strong option for homeowners and businesses across New Mexico.

Service Area

Sol Luna Solar serves the following areas within a 124-mile radius:

AlbuquerqueSanta FeTaosRio RanchoBernalilloCorralesLos LunasBelenEspanolaLas Vegas

Are you Sol Luna Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Commercial Solar
Maintenance
Monitoring

Certifications & Accreditations

NABCEP BBB A+ Rated

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

40 reviews

David L.

10 September 2025
Verified Customer

Sol Luna Solar handled our residential installation from beginning to end. The team was professional, the pricing was fair, and the system is producing exactly what they estimated. No complaints at all.

Patricia C.

28 May 2025
Verified Customer

We went with Sol Luna for a commercial rooftop installation on our office building in Santa Fe. Their experience showed in how smoothly everything went. The project was completed on schedule and within budget.

Steven A.

14 February 2025
Verified Customer

Good local company with solid experience. They designed a system that fits our property well and the installation was done in two days. Production has been consistent. Would recommend to neighbors.

Frequently Asked Questions About Sol Luna Solar

What services does Sol Luna Solar offer?

Sol Luna Solar offers Solar Installation, Battery Storage, Commercial Solar, Maintenance, Monitoring.

Is Sol Luna Solar NABCEP certified?

Yes, Sol Luna Solar is NABCEP certified and also holds BBB A+ Rated certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Sol Luna Solar serve?

Sol Luna Solar serves Albuquerque, Santa Fe, Taos, Rio Rancho, Bernalillo, Corrales, Los Lunas, Belen and 2 other areas. They are based in Albuquerque with a service radius of 200 km.

What warranty does Sol Luna Solar offer?

Sol Luna Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sol Luna Solar's customer reviews?

Sol Luna Solar has a 4.6/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Sol Luna Solar been in business?

Sol Luna Solar was founded in 1991 and has been in business for 35 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sol Luna Solar

Fill in your details and we'll connect you with Sol Luna Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote