SS

Solec SW Ltd

MCS certified solar PV installers and electricians across Devon — independent and individually quoted

Exeter, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

40 km

Service Area

1-10

Employees

SurgePV Score

5.2 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Solec SW Ltd

Solec SW Ltd is an independent solar panel installer and electrical contractor based at 52 Kingskerswell Road, Newton Abbot, Devon TQ12 1DG. The company installs commercial and domestic solar PV systems across Exeter, Torquay, and Newton Abbot, serving the wider South Devon area.

The team consists of highly qualified electricians with MCS certification, enabling all installations to meet the UK’s Microgeneration Certification Scheme quality standard. Solec SW operates as a fully independent installer, quoting each customer individually based on their specific roof configuration, energy consumption, and system requirements rather than applying a standardised package.

The company holds a Checkatrade verified profile, providing customer references and project photographs. Solec SW covers domestic rooftop installations as well as commercial-scale solar PV and EV charging point installations.

Solec SW Ltd is a practical local choice for Devon homeowners in the Newton Abbot, Torquay, and Exeter areas who want a directly employed, independent installation team rather than a national franchise operation.

Service Area

Solec SW Ltd serves the following areas within a 40 km radius:

ExeterNewton AbbotTorquayPaigntonTeignmouth

Contact Information

Are you Solec SW Ltd?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Solec SW Ltd

What services does Solec SW Ltd offer?

Solec SW Ltd offers Solar Installation, Battery Storage, EV Charging.

Is Solec SW Ltd MCS certified?

Yes, Solec SW Ltd is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Solec SW Ltd serve?

Solec SW Ltd serves Exeter, Newton Abbot, Torquay, Paignton, Teignmouth. They are based in Exeter with a service radius of 40 km.

What warranty does Solec SW Ltd offer?

Solec SW Ltd offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solec SW Ltd's customer reviews?

Solec SW Ltd does not have any reviews yet. Be the first to leave a review after using their services.

How long has Solec SW Ltd been in business?

Solec SW Ltd was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solec SW Ltd

Fill in your details and we'll connect you with Solec SW Ltd.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote