SS

Solstice Solar

Houston Chronicle Best of the Best 2025 solar company with 3,000+ installations across Greater Houston

Houston, Texas
4.9 (150 reviews)
Verified
Residential

6+

Years in Business

3,000+

Projects Completed

150

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
98%
Certifications
100%
Experience
70%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Solstice Solar

Solstice Solar is a Houston-based solar installation company founded in 2020, located at 9001 Jameel Road, Suite 150, Houston, TX 77040. The company has completed over 3,000 residential installations across Greater Houston and was voted Best Solar Company in Houston by the Houston Chronicle in their Best of the Best 2025 competition.

Solstice Solar holds NABCEP certification and is a certified installer for Tesla, Enphase, FranklinWH, and SPAN products. The company installs REC and Qcells panels alongside battery storage options from Tesla, FranklinWH, EcoFlow, and EG4. They also offer SPAN smart electrical panels and EV charger installations.

The company maintains a 4.9-star Google rating, with customers consistently praising the professional installation process, comprehensive handling of permits and HOA approvals, and responsive customer service throughout the project lifecycle.

Service Area

Solstice Solar serves the following areas within a 50-mile radius:

HoustonKatyCypressSugar LandMissouri CityGalveston

Are you Solstice Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

NABCEP Tesla Certified Enphase Certified FranklinWH Certified SPAN Certified

Partner Manufacturers

Panels

RECQcells

Inverters

Enphase

Batteries

Tesla PowerwallFranklinWHEcoFlowEG4

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

150 reviews

Verified Customer

1 October 2025
Verified Customer

Professional installation process with excellent customer service. Solstice handled all permits and HOA approvals seamlessly. System has been performing above estimates.

Verified Customer

15 August 2025
Verified Customer

From consultation to final inspection, the team was knowledgeable and responsive. They explained every aspect of the system design and helped us choose the right battery backup.

Verified Customer

20 June 2025
Verified Customer

Great experience overall. The installation crew was efficient and left the site clean. Our energy bills have dropped significantly since going solar.

Frequently Asked Questions About Solstice Solar

What services does Solstice Solar offer?

Solstice Solar offers Solar Installation, Battery Storage, EV Charging.

Is Solstice Solar NABCEP certified?

Yes, Solstice Solar is NABCEP certified and also holds Tesla Certified, Enphase Certified, FranklinWH Certified, SPAN Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Solstice Solar serve?

Solstice Solar serves Houston, Katy, Cypress, Sugar Land, Missouri City, Galveston. They are based in Houston with a service radius of 80 km.

What warranty does Solstice Solar offer?

Solstice Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solstice Solar's customer reviews?

Solstice Solar has a 4.9/5 rating based on 150 customer reviews. Customers consistently rate them highly.

How long has Solstice Solar been in business?

Solstice Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Solstice Solar

Fill in your details and we'll connect you with Solstice Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote