SS

Southern Solar & Electrical Contracting

Kentucky solar and electrical contractor serving Lexington since 2016 with seamless solar installation and electrical services

Lexington, Kentucky
4.5 (10 reviews)
Residential Commercial

10+

Years in Business

0

10

Customer Reviews

93 mi

Service Area

1-10

Employees

SurgePV Score

6.4 / 10
Customer Reviews
90%
Certifications
0%
Experience
85%
Services Range
60%
Warranty Coverage
80%
Online Presence
75%

About Southern Solar & Electrical Contracting

Southern Solar & Electrical Contracting LLC is a Kentucky-based solar and electrical contractor serving the Lexington area from their Louisville headquarters at 1403 Rowan St, Louisville, KY. Since 2016, the company has made renewable energy more accessible across the Kentuckiana region with seamless integration of solar and electrical services.

Southern Solar & Electrical Contracting was founded to fill a service gap in the market, excelling in delivering combined solar installation and electrical contracting services. The company provides expert solar panel installation for residential and commercial clients, ensuring high-quality workmanship and significant energy savings.

Southern Solar & Electrical Contracting serves all of Kentucky, Southern Indiana, Ohio, and neighboring states. The company has a dedicated Lexington service page and provides solar installation services throughout the Central Kentucky region including Frankfort, Shelbyville, and Georgetown.

Service Area

Southern Solar & Electrical Contracting serves the following areas within a 93-mile radius:

LexingtonLouisvilleFrankfortShelbyvilleLa GrangeGeorgetown

Are you Southern Solar & Electrical Contracting?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

10 reviews

Verified Customer

25 July 2025
Verified Customer

Southern Solar did an excellent job with our residential solar installation. The team was professional and the combined solar and electrical expertise meant everything was handled in one project.

Verified Customer

12 May 2025
Verified Customer

Great experience from start to finish. Mike and his team were responsive, knowledgeable, and completed the work efficiently. Our energy bills have dropped significantly.

Verified Customer

5 March 2025
Verified Customer

Professional service and quality installation. They handled both the electrical upgrades and solar panel installation seamlessly. Good communication throughout.

Frequently Asked Questions About Southern Solar & Electrical Contracting

What services does Southern Solar & Electrical Contracting offer?

Southern Solar & Electrical Contracting offers Solar Installation, Battery Storage.

Is Southern Solar & Electrical Contracting NABCEP certified?

Southern Solar & Electrical Contracting holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Southern Solar & Electrical Contracting serve?

Southern Solar & Electrical Contracting serves Lexington, Louisville, Frankfort, Shelbyville, La Grange, Georgetown. They are based in Lexington with a service radius of 150 km.

What warranty does Southern Solar & Electrical Contracting offer?

Southern Solar & Electrical Contracting offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Southern Solar & Electrical Contracting's customer reviews?

Southern Solar & Electrical Contracting has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Southern Solar & Electrical Contracting been in business?

Southern Solar & Electrical Contracting was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Southern Solar & Electrical Contracting

Fill in your details and we'll connect you with Southern Solar & Electrical Contracting.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote