SO

Spot On Solar

MCS-accredited Derbyshire solar installer offering PV, battery storage, off-grid and inverter repair services

Derby, UK
0 (0 reviews)
Verified
Residential Commercial off-grid

2026+

Years in Business

0

50 km

Service Area

1-10

Employees

SurgePV Score

5.5 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Spot On Solar

Spot On Solar Ltd is a Derbyshire-based solar PV installer registered at 20 Ludlow Road, Littleover, Derby, DE23 3AH. The company holds MCS accreditation and provides solar panel installations, battery storage, off-grid systems, inverter repair and servicing across Derby and the wider East Midlands.

The company’s service offering covers the full lifecycle of a solar installation: system design, supply and installation of MCS-accredited solar PV, battery storage integration, off-grid system design, and ongoing repairs and maintenance including inverter replacement or repair work. This breadth of technical capability makes Spot On Solar a useful contact for customers with existing systems requiring attention.

Customer feedback highlights the company’s flexibility during the design phase, competitive pricing and clear communication. Reviewers note that the team is responsive to last-minute changes and that installations are carried out with professional workmanship.

Spot On Solar Ltd can be contacted by phone on 07920 584707 or by email at [email protected].

Service Area

Spot On Solar serves the following areas within a 50 km radius:

DerbyLittleoverNottinghamLeicesterChesterfieldBurton upon Trent

Are you Spot On Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

0 reviews

Verified Customer

8 October 2025
Verified Customer

Professional and great value. After a very competitive price and great system recommendations we decided to go with Spot On Solar. It's one of those decisions we will never regret.

Verified Customer

17 August 2025
Verified Customer

I can highly recommend Spot On Solar — very competitive pricing, high quality panels and inverter, and professional installation. Any query I had was answered in a simple and uncomplicated manner.

Verified Customer

25 June 2025
Verified Customer

Very adaptable with the arrangement of the PV panels on the available roof space, and happy to listen and accommodate changes right up to the last minute on both price and capacity of the final system.

Frequently Asked Questions About Spot On Solar

What services does Spot On Solar offer?

Spot On Solar offers Solar Installation, Battery Storage, Maintenance.

Is Spot On Solar MCS certified?

Yes, Spot On Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Spot On Solar serve?

Spot On Solar serves Derby, Littleover, Nottingham, Leicester, Chesterfield, Burton upon Trent. They are based in Derby with a service radius of 50 km.

What warranty does Spot On Solar offer?

Spot On Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Spot On Solar's customer reviews?

Spot On Solar does not have any reviews yet. Be the first to leave a review after using their services.

How long has Spot On Solar been in business?

Spot On Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Spot On Solar

Fill in your details and we'll connect you with Spot On Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote