Sun Peach Solar
Atlanta-based solar and smart energy company offering solar panels, battery storage, EV charging, and home energy automation
2+
Years in Business
15
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Sun Peach Solar
Sun Peach Solar is a solar and smart energy company based at 505 North Angier Avenue, Suite 312, in Atlanta, Georgia. Founded by Jeremy and Jena Youngblood, the company provides solar panel installations, battery storage systems, EV charging, energy automation, and power monitoring services for residential customers across the Atlanta metro area. Sun Peach Solar is BBB-accredited and takes a technology-forward approach to residential energy, integrating smart home automation with solar and battery systems.
The company offers customized energy solutions that combine solar panels with battery backup and intelligent electrification to help homeowners achieve energy independence. Sun Peach Solar handles the full project from initial consultation and smart solar assessment through system design, permitting, installation, and ongoing monitoring. The company’s focus on energy automation sets it apart from traditional solar-only installers, providing homeowners with real-time power monitoring and control over their energy usage.
Sun Peach Solar serves the greater Atlanta area including Peachtree City, Decatur, Marietta, Roswell, Alpharetta, Fayetteville, and Newnan. The company works with homeowners to design systems that address both energy cost reduction and backup power needs, with a particular focus on smart energy management and automation technology.
Service Area
Sun Peach Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sun Peach Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
15 reviews
Jordan P.
Sun Peach Solar designed a complete system with panels, battery backup, and smart home integration. The energy automation features are a game changer. We can monitor and control everything from our phone.
Kimberly D.
Jeremy and the team at Sun Peach were transparent and knowledgeable throughout the process. The installation was clean, the crew was friendly, and the system started producing power the same week.
Alan S.
Good experience with Sun Peach. They took the time to explain the smart energy options and helped us choose a system that fits our needs. The battery backup has been useful during storm season.
Frequently Asked Questions About Sun Peach Solar
What services does Sun Peach Solar offer?
Sun Peach Solar offers Solar Installation, Battery Storage, EV Charging, Solar Design, Energy Audit, Monitoring.
Is Sun Peach Solar NABCEP certified?
Sun Peach Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Sun Peach Solar serve?
Sun Peach Solar serves Atlanta, Peachtree City, Decatur, Marietta, Roswell, Alpharetta, Fayetteville, Newnan. They are based in Atlanta with a service radius of 80 km.
What warranty does Sun Peach Solar offer?
Sun Peach Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sun Peach Solar's customer reviews?
Sun Peach Solar has a 4.8/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Sun Peach Solar been in business?
Sun Peach Solar was founded in 2024 and has been in business for 2 years. They are a newer entrant in the solar installation market.
Similar Installers in Atlanta
Get a Free Solar Quote from Sun Peach Solar
Fill in your details and we'll connect you with Sun Peach Solar.
Quote request sent!
Sun Peach Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile