SO

Suncatcher of Atlanta

Atlanta's longest-operating solar company since 1983, specializing in solar electric, solar hot water, and solar pool heating systems

Atlanta, Georgia
4.6 (20 reviews)
Verified
Residential Commercial

43+

Years in Business

0

20

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
92%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Suncatcher of Atlanta

Suncatcher of Atlanta is the longest-operating solar company in the Atlanta metropolitan area, founded in 1983 and headquartered at 1349 Old 41 Highway NW, Suite 100, in Marietta, Georgia. For over four decades, the company has provided solar electric, solar hot water, solar pool heating, and roofing services for residential and commercial customers across the greater Atlanta area. Suncatcher has been BBB-accredited since 2016 and maintains a strong reputation as a locally owned solar installer.

The company installs Qcells solar panels alongside Enphase and SolarEdge inverters and Tesla Powerwall battery storage. Suncatcher also installs AquaCal heat pumps and solar hybrid heat pump systems for swimming pools. The company’s broad service offering distinguishes it from newer, solar-only installers, providing customers with multiple energy solutions from a single provider. Suncatcher handles system design, permitting, installation, and ongoing maintenance.

Suncatcher of Atlanta serves the greater Atlanta metro area from its Marietta headquarters, covering Kennesaw, Roswell, Alpharetta, Smyrna, Woodstock, and Acworth. The company operates Monday through Friday from 9 AM to 3 PM. With over 40 years of continuous operation in the Georgia solar market, Suncatcher brings unmatched local experience to every project.

Service Area

Suncatcher of Atlanta serves the following areas within a 50-mile radius:

AtlantaMariettaKennesawRoswellAlpharettaSmyrnaWoodstockAcworth

Are you Suncatcher of Atlanta?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Panels

Qcells

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

20 reviews

Howard L.

8 September 2025
Verified Customer

Suncatcher has been around since 1983 and their experience shows. They installed a solar electric system and solar pool heater for us. Both are working perfectly and the crew was very professional.

Janet K.

17 June 2025
Verified Customer

We wanted a local company with a long track record and Suncatcher was the clear choice. They designed a system that fits our roof and our budget. The Tesla Powerwall was a great addition.

Steve M.

22 February 2025
Verified Customer

Reliable company with decades of experience. Our solar electric system was installed without issues. The only reason for four stars is that scheduling took a couple weeks longer than expected.

Frequently Asked Questions About Suncatcher of Atlanta

What services does Suncatcher of Atlanta offer?

Suncatcher of Atlanta offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Suncatcher of Atlanta NABCEP certified?

Suncatcher of Atlanta holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Suncatcher of Atlanta serve?

Suncatcher of Atlanta serves Atlanta, Marietta, Kennesaw, Roswell, Alpharetta, Smyrna, Woodstock, Acworth. They are based in Atlanta with a service radius of 80 km.

What warranty does Suncatcher of Atlanta offer?

Suncatcher of Atlanta offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Suncatcher of Atlanta's customer reviews?

Suncatcher of Atlanta has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Suncatcher of Atlanta been in business?

Suncatcher of Atlanta was founded in 1983 and has been in business for 43 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Suncatcher of Atlanta

Fill in your details and we'll connect you with Suncatcher of Atlanta.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote