Techsico Solar
NABCEP-certified Tesla Certified Installer serving Tulsa with residential and commercial solar
8+
Years in Business
20
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Techsico Solar
Techsico Solar is a Tulsa-based solar installation company headquartered at 5514 E 9th St, Tulsa, OK 74112. Founded in 2018, the company has quickly established itself as one of Oklahoma’s leading solar installers, holding the distinction of being the only company in the state with two NABCEP PVIP (Photovoltaic Installation Professional) certifications.
Techsico Solar is also a Tesla Certified Installer, specializing in Tesla Powerwall battery storage integration. Their service offerings include residential and commercial solar installations, energy storage systems, EV charging stations, and pergola/patio cover solar solutions. Every installation comes standard with efficient lighting upgrades and a smart thermostat installation.
The company serves the greater Tulsa metropolitan area and surrounding communities, providing turnkey solar solutions from initial consultation and system design through permitting, installation, and ongoing support.
Service Area
Techsico Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Techsico Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
20 reviews
Verified Customer
Techsico Solar handled everything from permitting to installation. The NABCEP certifications gave us peace of mind. Our system also came with LED lighting upgrades and a smart thermostat, which was a nice bonus.
Verified Customer
As a Tesla Powerwall owner, I wanted a certified installer. Techsico delivered a clean installation and the battery integration works flawlessly. Very professional team.
Verified Customer
Solid installation and good communication throughout. The system performs well and I appreciated that they included energy efficiency upgrades as part of the package.
Frequently Asked Questions About Techsico Solar
What services does Techsico Solar offer?
Techsico Solar offers Solar Installation, Battery Storage, EV Charging.
Is Techsico Solar NABCEP certified?
Techsico Solar holds the following certifications: NABCEP PVIP (x2), Tesla Certified Installer. Contact them directly for the latest accreditation details.
What areas does Techsico Solar serve?
Techsico Solar serves Tulsa, Broken Arrow, Owasso, Bixby, Sand Springs. They are based in Tulsa with a service radius of 100 km.
What warranty does Techsico Solar offer?
Techsico Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Techsico Solar's customer reviews?
Techsico Solar has a 4.7/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Techsico Solar been in business?
Techsico Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Tulsa
Get a Free Solar Quote from Techsico Solar
Fill in your details and we'll connect you with Techsico Solar.
Quote request sent!
Techsico Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile