US

US Solar Supplier

Louisville-based solar equipment supplier and installer with transparent pricing

Louisville, Kentucky
4.5 (8 reviews)
Verified
Residential Commercial

3+

Years in Business

0

8

Customer Reviews

93 mi

Service Area

1-10

Employees

SurgePV Score

7.1 / 10
Customer Reviews
90%
Certifications
60%
Experience
50%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About US Solar Supplier

US Solar Supplier is a solar equipment supplier and installer headquartered at 9152 Taylorsville Road, Suite 309, Louisville, KY 40299. Founded in November 2023, the company provides solar panels, inverters, storage solutions, charge controllers, and racking systems for both residential and commercial applications.

US Solar Supplier holds a BBB A- rating and is BBB accredited since November 2024. The company focuses on trusted products, honest pricing, and real customer support, serving clients across Kentucky and neighboring states.

Business hours are Monday through Friday, 8:00 AM to 8:00 PM EST, and Saturday, 9:00 AM to 1:00 PM EST. The company assists customers with full solar system components and installation services.

Service Area

US Solar Supplier serves the following areas within a 93-mile radius:

LouisvilleLexingtonFrankfortElizabethtownBowling Green

Are you US Solar Supplier?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Certifications & Accreditations

BBB A-

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

8 reviews

Verified Customer

2 October 2025
Verified Customer

US Solar Supplier provided quality panels and inverters at honest prices. Their Louisville-based support team was helpful throughout the process.

Verified Customer

15 July 2025
Verified Customer

Good selection of Tier 1 solar equipment and competitive pricing. The team was knowledgeable and helped us choose the right components for our system.

Verified Customer

8 April 2025
Verified Customer

Transparent pricing and quality products. US Solar Supplier made it easy to get the equipment we needed for our residential solar project.

Frequently Asked Questions About US Solar Supplier

What services does US Solar Supplier offer?

US Solar Supplier offers Solar Installation, Battery Storage, system_design.

Is US Solar Supplier NABCEP certified?

US Solar Supplier holds the following certifications: BBB A-. Contact them directly for the latest accreditation details.

What areas does US Solar Supplier serve?

US Solar Supplier serves Louisville, Lexington, Frankfort, Elizabethtown, Bowling Green. They are based in Louisville with a service radius of 150 km.

What warranty does US Solar Supplier offer?

US Solar Supplier offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are US Solar Supplier's customer reviews?

US Solar Supplier has a 4.5/5 rating based on 8 customer reviews. Customers consistently rate them highly.

How long has US Solar Supplier been in business?

US Solar Supplier was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from US Solar Supplier

Fill in your details and we'll connect you with US Solar Supplier.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote