VS

Velo Solar

Atlanta's leading commercial solar installer since 2008, with 35+ MW installed across 30 states and a licensed Professional Engineer on staff

Atlanta, Georgia
4.7 (15 reviews)
Verified
Commercial

18+

Years in Business

100+

Projects Completed

15

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9 / 10
Customer Reviews
94%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
63%
Online Presence
100%

About Velo Solar

Velo Solar is a commercial solar installation company headquartered at 154 Krog Street, Suite 140, in Atlanta, Georgia. Founded in 2008, the company specializes in custom rooftop, ground mount, and carport solar power systems for commercial and industrial businesses. With over 100 projects completed across 30 states and more than 35 megawatts of installed capacity, Velo Solar is one of the Southeast’s most experienced commercial solar installers. The company has a licensed Professional Engineer on staff, and the founder and president is an electrical engineer from the Georgia Institute of Technology.

Velo Solar’s services include comprehensive feasibility studies, custom system engineering and design, energy storage integration, permitting, installation, and proprietary real-time performance monitoring through their PowerEnfo platform. The company’s engineering team determines optimal panel counts, inverter selection, racking systems, and component layouts to maximize generation potential for each site. With over 100 years of combined team experience, Velo Solar brings deep technical knowledge to every project.

The company serves commercial and industrial customers throughout Georgia and across the United States from its Krog Street Market headquarters in Atlanta. Velo Solar works with businesses of all sizes, from small commercial rooftops to large-scale industrial installations. The company is BBB-accredited and maintains long-term relationships with clients through ongoing monitoring and maintenance services.

Service Area

Velo Solar serves the following areas within a 124-mile radius:

AtlantaDecaturSavannahMaconAugustaAthens

Are you Velo Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring
Maintenance

Certifications & Accreditations

Licensed Professional Engineer BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

15 reviews

David M.

15 August 2025
Verified Customer

Velo Solar engineered and installed a 200 kW rooftop system for our distribution center. Their engineering team's attention to detail was impressive. The system is performing above the feasibility study projections.

Lisa R.

3 May 2025
Verified Customer

We selected Velo for our commercial carport solar installation. Their proprietary monitoring platform gives us real-time visibility into system performance. Professional team from start to finish.

Martin K.

28 January 2025
Verified Customer

Solid commercial solar company with deep engineering expertise. The feasibility study was thorough and the installation met all timelines. The PowerEnfo monitoring tool is a nice touch.

Frequently Asked Questions About Velo Solar

What services does Velo Solar offer?

Velo Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring, Maintenance.

Is Velo Solar NABCEP certified?

Velo Solar holds the following certifications: Licensed Professional Engineer, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Velo Solar serve?

Velo Solar serves Atlanta, Decatur, Savannah, Macon, Augusta, Athens. They are based in Atlanta with a service radius of 200 km.

What warranty does Velo Solar offer?

Velo Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Velo Solar's customer reviews?

Velo Solar has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Velo Solar been in business?

Velo Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Velo Solar

Fill in your details and we'll connect you with Velo Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote