WA

Watrous Associates Architects

Nationally recognized Louisville firm specializing in passive-solar and energy-efficient design since 1985

Louisville, Kentucky
4.2 (5 reviews)
Verified
Residential Commercial

41+

Years in Business

0

5

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

7.8 / 10
Customer Reviews
84%
Certifications
75%
Experience
100%
Services Range
60%
Warranty Coverage
80%
Online Presence
50%

About Watrous Associates Architects

Watrous Associates Architects is a nationally recognized solar architectural firm located at 2711 West Main Street, Louisville, KY 40212. Founded in 1985 by Gary Watrous, AIA, the firm specializes in passive-solar, super-insulated design techniques for residential and commercial projects.

The firm is USGBC certified and received a National Renewable Energy Laboratory (NREL) award in 1994 for energy-efficient design. Watrous Associates integrates solar energy systems with architectural design to create buildings that minimize energy consumption and maximize renewable energy production.

Watrous Associates serves the Louisville metropolitan area and Southern Indiana, providing solar design and installation services alongside comprehensive architectural services for energy-efficient homes and commercial buildings.

Service Area

Watrous Associates Architects serves the following areas within a 62-mile radius:

LouisvilleJeffersontownProspectShelbyvilleSouthern Indiana

Are you Watrous Associates Architects?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
system_design

Certifications & Accreditations

USGBC Certified NREL Award (1994)

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.2

5 reviews

Verified Customer

20 July 2025
Verified Customer

Watrous Associates designed a stunning passive-solar home for us. Gary Watrous brings decades of renewable energy design expertise to every project.

Verified Customer

10 April 2025
Verified Customer

Excellent solar architecture design. Watrous Associates combines energy-efficient building design with solar integration for truly sustainable homes.

Verified Customer

18 January 2025
Verified Customer

A unique firm that approaches solar from an architectural perspective. Their passive-solar designs reduce energy needs before adding solar panels.

Frequently Asked Questions About Watrous Associates Architects

What services does Watrous Associates Architects offer?

Watrous Associates Architects offers Solar Installation, system_design.

Is Watrous Associates Architects NABCEP certified?

Watrous Associates Architects holds the following certifications: USGBC Certified, NREL Award (1994). Contact them directly for the latest accreditation details.

What areas does Watrous Associates Architects serve?

Watrous Associates Architects serves Louisville, Jeffersontown, Prospect, Shelbyville, Southern Indiana. They are based in Louisville with a service radius of 100 km.

What warranty does Watrous Associates Architects offer?

Watrous Associates Architects offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Watrous Associates Architects's customer reviews?

Watrous Associates Architects has a 4.2/5 rating based on 5 customer reviews. They are well-regarded by their customers.

How long has Watrous Associates Architects been in business?

Watrous Associates Architects was founded in 1985 and has been in business for 41 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Watrous Associates Architects

Fill in your details and we'll connect you with Watrous Associates Architects.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote