Wayne Lawrence Electrical Contractors
Family-run Derby solar installer with 35+ years of electrical experience, NICEIC approved and MCS accredited since 1992
34+
Years in Business
28
Customer Reviews
20 km
Service Area
1-10
Employees
SurgePV Score
About Wayne Lawrence Electrical Contractors
Wayne Lawrence Electrical Contractors Ltd is a family-run electrical and solar PV business based at 135 High Street, Chellaston, Derby, DE73 6TG. The company has operated as an NICEIC Approved Contractor since 1992, bringing over 35 years of electrical contracting experience to its residential and commercial solar panel installations.
The company operates the dedicated solar installation brand Solar Panels Derby (solar-panels-derby.com) and serves customers within a 20-mile radius of Derbyshire. Wayne Lawrence is MCS accredited for solar PV and battery storage installations and holds TrustMark registration.
Services include the supply and installation of solar PV systems, battery storage and associated electrical work for both domestic and commercial properties. The company’s long-established roots in Derbyshire electrical contracting mean that their solar offering is backed by deep knowledge of local building stock and roof types.
Customer reviews highlight the depth of technical expertise available from initial survey, the quality of the written quotation, and the professional conduct of the installation team. Customers on both the Derbyshire Trusted Trader scheme and Local Quotes consistently award five-star ratings.
Wayne Lawrence Electrical Contractors can be reached by phone on 01332 690262 or by email at [email protected].
Service Area
Wayne Lawrence Electrical Contractors serves the following areas within a 20 km radius:
Contact Information
Are you Wayne Lawrence Electrical Contractors?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
28 reviews
Verified Customer
Wayne was head and shoulders above other solar contractors. He was able to answer all our questions during the quoting phase and carried out a diligent installation. Very professional from start to finish.
Verified Customer
Wayne impressed us with his depth of knowledge and enthusiasm. He provided an extremely detailed quote, and his installation team were excellent, courteous and eager to discuss the work.
Frequently Asked Questions About Wayne Lawrence Electrical Contractors
What services does Wayne Lawrence Electrical Contractors offer?
Wayne Lawrence Electrical Contractors offers Solar Installation, Battery Storage.
Is Wayne Lawrence Electrical Contractors MCS certified?
Yes, Wayne Lawrence Electrical Contractors is MCS certified and also holds TrustMark certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Wayne Lawrence Electrical Contractors serve?
Wayne Lawrence Electrical Contractors serves Derby, Chellaston, Shardlow, Melbourne, Castle Donington, Swadlincote. They are based in Derby with a service radius of 20 km.
What warranty does Wayne Lawrence Electrical Contractors offer?
Wayne Lawrence Electrical Contractors offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Wayne Lawrence Electrical Contractors's customer reviews?
Wayne Lawrence Electrical Contractors has a 4.8/5 rating based on 28 customer reviews. Customers consistently rate them highly.
How long has Wayne Lawrence Electrical Contractors been in business?
Wayne Lawrence Electrical Contractors was founded in 1992 and has been in business for 34 years. They are one of the more experienced solar installers in their area.
Similar Installers in Derby
Get a Free Solar Quote from Wayne Lawrence Electrical Contractors
Fill in your details and we'll connect you with Wayne Lawrence Electrical Contractors.
Quote request sent!
Wayne Lawrence Electrical Contractors will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile