Back to Best Solar Software
Best List Best-Of List 5 tools compared

Best Solar Proposal Software in Lithuania (2026)

Compare the best solar proposal software in Lithuania for 2026. Expert-tested tools for sales teams and installers with net metering modeling, pricing, and close rate data.

Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Content Head · SurgePV

Published ·Updated

TL;DR: SurgePV is the best solar proposal software for Lithuania — combining integrated design-to-proposal workflow, native ESO net metering modeling, feed-in premium calculations, and branded templates in one platform at $1,899/year for 3 users. OpenSolar is the affordable residential alternative ($50-150/month). Energy Toolbase leads for commercial + storage financial analysis. Aurora Solar suits international teams. Solargraf delivers speed for high-volume residential sales.

Lithuanian solar installers face a math problem. Over 50 companies compete for commercial and residential projects across Vilnius, Kaunas, and Klaipeda. Customers request 3-5 quotes before deciding. And the installer who delivers a professional, accurate proposal first wins the deal 40% of the time (SolarPower Europe).

Yet most Lithuanian installers still build proposals manually. Design calculations in one spreadsheet. Net metering economics in another. Financial scenarios typed into a Word template. The result: 4-8 hours per proposal, pricing errors that compress margins, and inconsistent quality that costs deals.

The best solar proposal software for Lithuania automates financial modeling (ESO net metering, feed-in premiums, green loan scenarios), generates branded proposals in under 1 hour, and integrates directly with your design workflow so you never re-enter data.

In this guide, you’ll learn:

  • Which platform generates accurate Lithuanian proposals fastest (under 1 hour vs. 4-8 hours manually)
  • How to model ESO net metering, feed-in premiums, and green loan scenarios automatically
  • Pricing comparison across all 5 platforms (from $50/month to $500+/month)
  • Which tools actually improve close rates in the Lithuanian market

Quick Comparison Table

SoftwareBest ForPricing/MonthDesign IntegrationLithuanian Financials
SurgePVCommercial EPCs (integrated)From $158/mo (3 users)Yes (built-in)Yes (native)
OpenSolarResidential on budget$50-150/moYes (basic)Manual setup
Energy ToolbaseCommercial + storage$300-600/moNo (standalone)Manual rates
Aurora SolarInternational teams$250-500/moYes (built-in)Manual setup
SolargrafHigh-volume residential$100-300/moBasicManual only

Best Solar Proposal Software in Lithuania (Detailed Reviews)

SurgePV — Best End-to-End Platform for Lithuanian Solar Proposals

Best For: Commercial installers, EPCs, and growing solar teams

Pricing: $1,899/year (3 users); $1,499/user/year (For 3 Users plan)

Proposal Speed: Under 1 hour from design to customer-ready document

SurgePV is a cloud-based solar design and proposal platform that combines layout design, simulation, electrical engineering, and professional proposals in a single workflow — eliminating the need for separate design, proposal, and financial modeling tools.

For Lithuanian installers, the integrated workflow is where the real value lies.

Here’s the problem most teams face: you design a system in one tool, then manually re-enter all the data into a proposal template. Equipment specs, production estimates, financial scenarios — everything typed twice. That workflow invites errors, wastes 2-3 hours per project, and produces inconsistent results depending on who’s building the proposal.

SurgePV eliminates that entirely. Design flows directly into the proposal. Every number matches because it’s the same platform.

Key Features for Lithuania

  • ESO net metering calculator — Accurate annual bill savings using Lithuania’s 1:1 credit ratio and annual reconciliation rules. That means your customer sees exactly what they’ll save — not a rough estimate that erodes trust when the first ESO bill arrives.
  • Feed-in premium modeling — Calculate auction-based revenue for projects above 30 kW (EUR 0.05-0.08/kWh). Multi-scenario comparison built in.
  • Lithuanian tax incentive integration — Incorporate 9% reduced VAT, 4-year accelerated depreciation, and property tax exemptions automatically.
  • Green loan scenarios — Model financing from SEB Bank, Swedbank, and Luminor at 3.5-6.5% interest. Present cash purchase vs. loan vs. leasing side by side.
  • Branded templates — Customizable with your company logo, colors, and formatting. Professional presentation signals installation quality to Lithuanian customers.
  • Financial modeling — EUR-based calculations with volatile Lithuanian electricity price scenarios (0.08-0.18 EUR/kWh). ROI, payback period, and LCOE included.

Pro Tip

SurgePV’s design-to-proposal flow means zero data re-entry. Design a system, generate a proposal, and send it to your customer — all within 1 hour. That’s 3-7 hours faster than manual workflows. Book a demo to see the full workflow.

Pricing

PlanPriceUsers
Individual$1,899/year3 users
For 3 Users$1,499/user/year3 users
For 5 Users$1,299/user/year5 users
EnterpriseCustomMultiple

Design + proposals + electrical engineering + simulation included on every plan. No hidden fees. See full pricing.

Who SurgePV Is Best for in Lithuania

  • Commercial installers handling 50-500 kW projects needing fast, professional proposals
  • Growing EPCs scaling from 10 to 50+ projects per year
  • Solar sales teams needing design-integrated proposal tools
  • Teams looking to eliminate separate solar software costs ($100-300/month)

Limitations

  • Learning curve of 1-2 weeks for teams new to integrated platforms
  • Interface primarily English (proposals exportable in Lithuanian)

Real-World Example

A commercial solar installer in Kaunas was losing deals because their manual proposals took 5-6 days to deliver. Competitors who responded in 48 hours were winning 60% of the time. After adopting SurgePV, the same team now sends branded, financially accurate proposals within 24 hours. Their close rate jumped from 18% to 28% within 3 months — a 55% improvement driven entirely by proposal speed and professionalism.

Further Reading

You might be thinking: if I already have a proposal template that works, why switch? Consider this: 50+ installers in Lithuania are competing for the same projects. Your proposal isn’t just a document — it’s a signal of professionalism. When customers compare 3-5 proposals, the one with accurate financials, professional branding, and 3D renderings wins. Templates can’t do that. Integrated software can.


OpenSolar — Affordable Proposal Tool for Small Lithuanian Installers

Best For: Residential installers on a budget, small teams under 10 people

Pricing: $50-150/month

OpenSolar is an Australian cloud-based proposal and design platform that offers affordable pricing for small installers with a focus on residential projects and international availability.

What Works for Lithuania

  • Affordable entry point for small installers starting out ($50/month)
  • Professional proposal templates with branding customization
  • Simple, intuitive interface with minimal learning curve

Where It Falls Short in Lithuania

  • No native Lithuanian support — ESO net metering calculations require manual custom formulas
  • Limited financial modeling — Lithuanian tax incentives (9% VAT, depreciation) need manual input
  • Residential focus — Less suitable for commercial proposals above 100 kW

Best for: Small residential installers (5-20 projects/year) seeking affordable proposal automation with manual Lithuanian customization.

Read our full OpenSolar review for more details.

Did You Know?

Lithuania’s solar irradiance ranges from 1,000-1,100 kWh/m2/year, making accurate solar simulation software essential for bankable energy yield predictions. Projects using validated simulation tools see 15-20% fewer financing rejections compared to those relying on manual calculations (SolarPower Europe Market Outlook).


Energy Toolbase — Financial Modeling for Commercial + Storage Projects

Best For: Commercial solar + battery storage, detailed LCOE analysis

Pricing: $300-600/month

Energy Toolbase is a US-based financial modeling platform specializing in commercial solar and storage projects with detailed LCOE, NPV, IRR, and cash flow analysis.

What Works for Lithuania

  • Detailed financial modeling (LCOE, NPV, IRR, cash flows) for commercial customers
  • Excellent battery storage integration — relevant as Lithuania’s behind-the-meter storage market grows
  • Professional financial reports that build C&I customer confidence

Where It Falls Short in Lithuania

  • No Lithuanian localization — Requires manual ESO rate entry and net metering formulas
  • US-centric utility rate database — Lithuanian rates must be entered manually
  • No design tool — Requires separate solar design software (SurgePV, Aurora, HelioScope)
  • Premium pricing — $300-600/month is significant for Lithuanian market margins

Best for: Large commercial solar + storage projects (above 250 kW) requiring detailed financial presentations for corporate facility managers.

See our full Energy Toolbase review.


Aurora Solar — Professional Proposals for International Teams

Best For: Installers working across US and Lithuanian markets

Pricing: $250-500/month

Aurora Solar is a US-based design and proposal platform with strong residential capabilities, offering remote design, professional templates, and financing marketplace integration.

What Works for Lithuania

  • Design-to-proposal integration with professional visual output
  • High-quality 3D system renderings help customers visualize their projects
  • Strong brand recognition builds customer trust

Where It Falls Short in Lithuania

  • No Lithuanian financial support — ESO net metering, feed-in premiums, and tax incentives require manual setup
  • US financing marketplace — Lithuanian lender integrations not available
  • Higher cost — $250-500/month is steep compared to Lithuania-optimized alternatives

Best for: International installers working in both US and Lithuanian markets who are comfortable with manual Lithuanian financial customization.

For a deeper analysis, read our full Aurora Solar review.


Solargraf — Fast Quoting for High-Volume Residential Sales

Best For: High-volume residential sales teams, door-to-door operations

Pricing: $100-300/month

Solargraf is a sales-focused proposal tool optimized for residential solar teams that prioritize speed above everything else.

What Works for Lithuania

  • Fastest quote generation in the market (under 15 minutes for residential)
  • Mobile app for field sales — generate quotes on-site during customer visits
  • Sales pipeline tracking and CRM integration

Where It Falls Short in Lithuania

  • No Lithuanian support — Manual language translation and financial modeling required
  • Residential-only — Not suitable for commercial or utility-scale proposals
  • Limited customization — Less flexible for complex multi-scenario proposals

Best for: High-volume residential installers (50+ quotes/month) with dedicated sales teams who prioritize quoting speed over financial depth.

Read our full Solargraf review.


Solar Proposal Software Comparison Table for Lithuania

FeatureSurgePVOpenSolarEnergy ToolbaseAurora SolarSolargraf
Best forCommercial EPCsBudget residentialC&I + storageInternationalHigh-volume
Design integrationYes (built-in)Yes (basic)NoYesBasic
Net metering (ESO)Yes (native)ManualManualManualManual
Financial modelingYes (EUR, scenarios)BasicYes (advanced)Yes (US focus)Basic
Branded templatesYesYesLimitedYesYes
E-signatureYesYesNoYesYes
Cloud-basedYesYesYesYesYes
Storage modelingYesBasicYes (excellent)LimitedNo
Pricing/monthFrom $158 (3 users)$50-150$300-600$250-500$100-300

Further Reading

For a broader comparison beyond Lithuania, see our guide to the best solar proposal software globally.


What Wins Deals in Lithuania: The Proposal Requirements That Matter

Lithuanian Financial Modeling Accuracy

Proposals must accurately reflect Lithuanian net metering rules (ESO annual reconciliation, 1:1 credit up to 500 kW), feed-in premium rates (auction-based EUR 0.05-0.08/kWh), and tax incentives (9% VAT, accelerated depreciation). A proposal with wrong numbers doesn’t just lose the deal — it damages your reputation with every customer who talks to their neighbor. SurgePV handles these calculations natively. Other tools require manual spreadsheet work.

Professional Presentation and Branding

In a market with 50+ competing installers, proposal quality is a proxy for installation quality. Lithuanian customers compare proposals side by side. The one with 3D renderings, branded formatting, and clear financial charts wins more often than the generic PDF from a spreadsheet. This isn’t about aesthetics — it’s about trust.

Speed: The 48-Hour Rule

Lithuanian customers expect proposal turnaround within 24-48 hours for residential and 3-5 days for commercial. Manual workflows that take 4-8 hours per proposal mean your team can handle 2-3 proposals per day at most. Automated software (SurgePV, Solargraf) pushes that to 5-8 proposals per day — a direct revenue multiplier.

Design Integration vs. Standalone

Integrated platforms (SurgePV, Aurora Solar) eliminate data re-entry between design and proposal — reducing errors and saving 1-2 hours per project. Standalone tools (Energy Toolbase, Solargraf) require manual input from your design software, which introduces risk every time someone types a number.


Our Testing Methodology

We evaluated each platform against five weighted criteria specific to Lithuanian proposal workflows:

  1. Proposal speed (25%) — Timed from design completion to customer-ready PDF. Tested with 10 commercial and 10 residential Lithuanian projects. Target: under 1 hour for commercial, under 30 minutes for residential.
  2. Financial accuracy (25%) — Validated net metering calculations against ESO billing rules, verified tax incentive modeling against Lithuanian tax code, tested financing scenarios against SEB Bank and Swedbank loan terms.
  3. Customization and branding (20%) — Assessed template flexibility, branding options, Lithuanian language support, visual design quality (3D renderings, charts, formatting).
  4. Ease of use (15%) — Hands-on testing with Lithuanian sales teams at beginner to expert experience levels, learning curve assessment, mobile access testing.
  5. Integration and workflow (15%) — Tested design-to-proposal workflow, CRM connectivity, e-signature capabilities, multi-user collaboration.

Testing was conducted between December 2025 and January 2026, using real Lithuanian project data from commercial (100-250 kW) and residential (5-10 kW) installations.

Generate Lithuanian Solar Proposals in Under 1 Hour

Integrated design-to-proposal workflow with ESO net metering, feed-in premium modeling, and branded templates.

Book a Demo

No commitment required · 20 minutes · Live project walkthrough


Bottom Line: Best Solar Proposal Software for Lithuania

Lithuania’s solar market is getting more competitive every quarter. The installers winning deals aren’t necessarily the cheapest — they’re the ones delivering professional, accurate proposals faster than anyone else.

Here’s how to choose:

For commercial installers and EPCs: SurgePV offers the most complete solution with integrated design-to-proposal workflow, native Lithuanian financial modeling (ESO net metering, feed-in premium, tax incentives), and professional branding — all in one platform. The under-1-hour proposal turnaround and 20-30% close rate improvement deliver clear ROI at $1,899/year for 3 users.

For residential installers on a budget: OpenSolar provides affordable proposal automation with professional templates at $50-150/month. Requires manual Lithuanian financial modeling but offers good value for small teams.

For commercial + storage projects: Energy Toolbase excels at detailed LCOE and cash flow analysis for larger commercial solar + battery storage projects. Best for sophisticated financial presentations.

For international teams: Aurora Solar works well for installers operating in both US and Lithuanian markets, though it requires manual Lithuanian financial customization.

For high-volume residential sales: Solargraf delivers the fastest residential quoting for teams prioritizing speed over customization — ideal for operations generating 50+ quotes per month.

Every day you spend building proposals manually is a day your competitor sends an automated one first. In a market where first-mover wins 40% of bids, proposal speed isn’t a nice-to-have — it’s revenue on the table.

Want to see how SurgePV handles Lithuanian proposals? Book a demo and our team will walk you through a real project using your data.

Compare SurgePV’s pricing — transparent rates, all features included.

Further Reading


Frequently Asked Questions

What is the best solar proposal software in Lithuania?

SurgePV is the best solar proposal software for Lithuania in 2026. It offers integrated design-to-proposal workflow with native Lithuanian financial modeling (ESO net metering, feed-in premium, tax incentives), and professional branded proposals generated in under 1 hour. For budget-conscious residential teams, OpenSolar offers affordable alternatives.

How long does it take to create a solar proposal in Lithuania?

Manual proposal creation takes 4-8 hours in Lithuania (design, financial modeling, formatting, translation). Automated proposal software reduces this to under 1 hour (SurgePV, Aurora Solar) or under 30 minutes (Solargraf for residential). The time savings alone justify the software cost for teams producing 10+ proposals per month.

Can I create Lithuanian-language solar proposals?

Yes, SurgePV exports customer-facing proposals in Lithuanian with net metering calculations, tax incentives, and professional formatting. Most other tools (Aurora Solar, OpenSolar, Energy Toolbase) require manual Lithuanian translation of proposal content.

How do I calculate net metering savings in Lithuanian solar proposals?

Net metering savings in Lithuania are calculated as annual excess generation multiplied by ESO electricity rate (EUR 0.12-0.18/kWh average) with 1:1 credit ratio and annual reconciliation. SurgePV automates this calculation. Manual calculation requires spreadsheet formulas accounting for seasonal production variability.

What financing options should I include in Lithuanian solar proposals?

Lithuanian solar proposals should include cash purchase (fastest payback at 6-10 years), green loans (SEB Bank, Swedbank, Luminor at 3.5-6.5% interest), and leasing options (no upfront cost). Present 2-3 scenarios side by side so customers can choose based on their budget and cash flow preferences.

How much does solar proposal software cost in Lithuania?

Costs range from EUR 50/month (OpenSolar basic) to EUR 600/month (Energy Toolbase premium). SurgePV starts at $1,899/year for 3 users ($158/month) with design + proposals included. ROI is typically achieved within 1-3 months through time savings (60+ hours/month) and close rate improvement (20-30%). See SurgePV pricing.

Do I need design software to create solar proposals?

No, standalone tools (Energy Toolbase, Solargraf) allow manual data entry without design software. However, integrated platforms (SurgePV, Aurora Solar) offering design + proposal eliminate data re-entry and reduce errors. For Lithuanian teams producing 10+ proposals per month, integrated platforms deliver better ROI. See our all-in-one solar software comparison.

How do solar proposals impact close rates in Lithuania?

Professional, branded proposals with accurate financial modeling increase close rates by 20-30% in the Lithuanian market. Key factors: proposal speed (first proposal wins 40% of bids), professional presentation (signals installation quality), accurate ESO net metering calculations (builds trust), and visual renderings (help customer decision-making). Learn about solar sales tools.


Sources

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is Co-Founder of SurgePV and Chief Marketing Officer at Heaven Green Energy Limited, where he oversees marketing, customer success, and strategic partnerships for a 1+ GW solar portfolio. With 10+ years in commercial solar project development, he has been directly involved in 300+ commercial and industrial installations and led market expansion into five new regions, improving win rates from 18% to 31%.

Editor
Rainer Neumann
Rainer Neumann

Content Head · SurgePV

Rainer Neumann is Content Head at SurgePV and a solar PV engineer with 10+ years of experience designing commercial and utility-scale systems across Europe and MENA. He has delivered 500+ installations, tested 15+ solar design software platforms firsthand, and specialises in shading analysis, string sizing, and international electrical code compliance.

Ready to Design and Propose Faster?

SurgePV combines design, simulation, SLDs, and proposals in one platform — with financial modeling for global markets.